logo

Furnish and Install Concrete Floor Coating at Various Locations

The scope, dates and status of this tender. A free account opens every field.

Source: Hawaii Purchasing Group

Tender
Closed

I . OVERVIEW . This contract is to furnish and install concrete floor coating at various locations . The Contractor shall prepare , provide , and install new resin / epoxy - urethane coating on an as needed basis at various comfort stations and other concrete floor surfaces on Oahu for the Department of Parks an

Status
Closed
Sector
Oil and Gas, Chemical (Industrial), Manufacturing (Industrial), Water Supply and Storage, Cement
Location
Hawaii, United States of America
Updated
3 Nov 2026
Source
Hawaii Purchasing Group

ConstructChat

Ask ConstructChat about Furnish and Install Concrete Floor Coating at Various Locations

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Furnish and Install Concrete Floor Coating at Various Locations” is a tender record in Taiyo, linked to the Oil and Gas sector. It is issued for works, goods, or services related to Hawaii, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

I . OVERVIEW . This contract is to furnish and install concrete floor coating at various locations . The Contractor shall prepare , provide , and install new resin / epoxy - urethane coating on an as needed basis at various comfort stations and other concrete floor surfaces on Oahu for the Department of Parks and Recreation , City and County of Honolulu , Hawaii . All work shall be requested by , and to completed the satisfaction of the designated Officerin - Charge ( OIC ). All work shall be approved and executed with the issuance of a Delivery Order ( DO ). Contractor shall provide all supplies , equipment , and labor to fulfill the contract . II . TECHNICAL / PERFORMANCE REQUIREMENTS A . Timeframe . All on - site work shall be done from Monday to Friday , except City and County of Honolulu holidays , in compliance with the State Community Noise Control for Oahu and Wage / Hour Schedules . Access and start times for project shall be coordinated with the OIC . B . Bio - sock and Water Pollution Controls . The Contractor must set up appropriate bio - sock and water pollution controls prior to start of the project . Contractor shall employ Storm Water Best Management Practice Manual for Construction , dated November 2011 . C . Surface Preparation . 1 . Surface must be properly prepared , cleaned and dried by mechanically abrading and scarifying the surface profile equivalent to a Concrete Surface Preparation 3 ( CSP 3 ) rating by shot blasting or diamond grinding . 2 . The Contractor shall remove any remaining loose , deteriorated materials and other floor products to attain a surface that is clean , free of dust , dirt , grease , paint , oil , chemicals and other contaminants . D . Concrete Curing Agents . The Contractor shall not use concrete curing agents as they may prevent bonding . curing material is present , the surface must be shot blasted to remove these contaminants . E . Repair . The Contractor shall repair and fill spalls , control joints , and cracks with fast cure resin and sand level once dry to ensure a smooth , flat surface . F . Water Vapor . If concrete substrate has significant water vapor , the Contractor must use an appropriate water vapor primer to aid in adhesion and chemical resistance . G . Base Coat . The Contractor shall : 1 . Mix GSPEC Fast Cure Resin and GSPEC Epoxy - Urethane Cement , FasTrac CE330 mixture or approved substitutes , as per mixing instructions , and apply within recoat window by gauge rake or trowel squeegee to 1 / 16 " thickness . 2 . Trowel on epoxy mortar cover base . 3 . Back roll with nap roller to remove squeegee marks to achieve a smooth finish . 4 . Broadcast with quartz sand or similar alternative aggregate to rejection point before product life expires . 5 . Allow to cure dry for twenty - four ( 24 ) hours and the surface is " dry to touch ." H . Тop Coat . 1 . The Contractor shall : 1 . Top coat with GSPEC Fast Cure Resin , FasTrac CE330 resin , or an approved substitute with squeegee or trowel within re - coat window . 2 . Back roll with nap roller to remove any squeegee marks for a smooth finish . 3 . Allow to cure for 24 hours . Additional Volume Discount . 1 . If applicable , the Contractor may provide an additional volume discount based on the project ' s material quantities , geographical proximity to other projects , or other manufacturer or Contractor incentives . The Contractor shall provide the discount on the quote .

Location

Country

United States of America (USA)

State

Hawaii

Source

Source

Hawaii Purchasing Group

URL

More Details

Record type

Tender

Sector

Oil and Gas, Chemical (Industrial), Manufacturing (Industrial), Water Supply and Storage, Cement

Article published date

2026-04-08

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender