Furnish and Install Concrete Floor Coating at Various Locations
The scope, dates and status of this tender. A free account opens every field.
Source: Hawaii Purchasing Group
I . OVERVIEW . This contract is to furnish and install concrete floor coating at various locations . The Contractor shall prepare , provide , and install new resin / epoxy - urethane coating on an as needed basis at various comfort stations and other concrete floor surfaces on Oahu for the Department of Parks an
- Status
- Closed
- Sector
- Oil and Gas, Chemical (Industrial), Manufacturing (Industrial), Water Supply and Storage, Cement
- Location
- Hawaii, United States of America
- Updated
- 3 Nov 2026
- Source
- Hawaii Purchasing Group
ConstructChat
Ask ConstructChat about Furnish and Install Concrete Floor Coating at Various Locations
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | I . OVERVIEW . This contract is to furnish and install concrete floor coating at various locations . The Contractor shall prepare , provide , and install new resin / epoxy - urethane coating on an as needed basis at various comfort stations and other concrete floor surfaces on Oahu for the Department of Parks and Recreation , City and County of Honolulu , Hawaii . All work shall be requested by , and to completed the satisfaction of the designated Officerin - Charge ( OIC ). All work shall be approved and executed with the issuance of a Delivery Order ( DO ). Contractor shall provide all supplies , equipment , and labor to fulfill the contract . II . TECHNICAL / PERFORMANCE REQUIREMENTS A . Timeframe . All on - site work shall be done from Monday to Friday , except City and County of Honolulu holidays , in compliance with the State Community Noise Control for Oahu and Wage / Hour Schedules . Access and start times for project shall be coordinated with the OIC . B . Bio - sock and Water Pollution Controls . The Contractor must set up appropriate bio - sock and water pollution controls prior to start of the project . Contractor shall employ Storm Water Best Management Practice Manual for Construction , dated November 2011 . C . Surface Preparation . 1 . Surface must be properly prepared , cleaned and dried by mechanically abrading and scarifying the surface profile equivalent to a Concrete Surface Preparation 3 ( CSP 3 ) rating by shot blasting or diamond grinding . 2 . The Contractor shall remove any remaining loose , deteriorated materials and other floor products to attain a surface that is clean , free of dust , dirt , grease , paint , oil , chemicals and other contaminants . D . Concrete Curing Agents . The Contractor shall not use concrete curing agents as they may prevent bonding . curing material is present , the surface must be shot blasted to remove these contaminants . E . Repair . The Contractor shall repair and fill spalls , control joints , and cracks with fast cure resin and sand level once dry to ensure a smooth , flat surface . F . Water Vapor . If concrete substrate has significant water vapor , the Contractor must use an appropriate water vapor primer to aid in adhesion and chemical resistance . G . Base Coat . The Contractor shall : 1 . Mix GSPEC Fast Cure Resin and GSPEC Epoxy - Urethane Cement , FasTrac CE330 mixture or approved substitutes , as per mixing instructions , and apply within recoat window by gauge rake or trowel squeegee to 1 / 16 " thickness . 2 . Trowel on epoxy mortar cover base . 3 . Back roll with nap roller to remove squeegee marks to achieve a smooth finish . 4 . Broadcast with quartz sand or similar alternative aggregate to rejection point before product life expires . 5 . Allow to cure dry for twenty - four ( 24 ) hours and the surface is " dry to touch ." H . Тop Coat . 1 . The Contractor shall : 1 . Top coat with GSPEC Fast Cure Resin , FasTrac CE330 resin , or an approved substitute with squeegee or trowel within re - coat window . 2 . Back roll with nap roller to remove any squeegee marks for a smooth finish . 3 . Allow to cure for 24 hours . Additional Volume Discount . 1 . If applicable , the Contractor may provide an additional volume discount based on the project ' s material quantities , geographical proximity to other projects , or other manufacturer or Contractor incentives . The Contractor shall provide the discount on the quote . |
Location
Country | United States of America (USA) |
State | Hawaii |
Source
Source | Hawaii Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Oil and Gas, Chemical (Industrial), Manufacturing (Industrial), Water Supply and Storage, Cement |
Article published date | 2026-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Oil and Gas tenders in United States of America
- Road Material and Hauling Services
- Used Gasoline Collection Transport Recycling Service
- Town Wide Energy Resilience Master Plan
- ANTIFREEZE OILS AND LUBRICANTS
- Road Material and Hauling Services UPDATED
- Southeast Water Pollution Control Plant Biosolids Digester F...
- Sunol Long Term Improvements Alameda Creek Watershed Center
- City Distribution Division Fueling Station - BID TABULATION
