Future Smart Grid Build-Outs

Sector: Commercial • Location: Virginia Beach, Virginia, United States of America

Source: SAMGOVCO

Tender
Special Notice

Joint Expeditionary Base Little Creek-Fort Story (JEBLCFS) would like to develop an economically viable energy conservation project that includes: Identify and evaluate solutions to repurpose/decentralize steam production assets for on-site power generation and battery storage, providing black-start capability during power outages. Convert steam mechanical systems to gas and/or electric systems in

Status
Prospective
Sector
Commercial, Power Transmission, Energy Storage, Natural Gas, Power Generation (CCGT), Aerospace & Defense, Residential, Water Supply and Storage
Location
Virginia Beach, Virginia, United States of America
Updated
3 Nov 2026
Source
SAMGOVCO

ConstructChat

Ask ConstructChat about Future Smart Grid Build-Outs

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Future Smart Grid Build-Outs” is a tender record in Taiyo, linked to the Commercial sector. It is issued for works, goods, or services related to Virginia Beach, Virginia, United States of America.

Participants

Not available for this record.

Status

Original status

special notice

Taiyo status

Prospective

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Joint Expeditionary Base Little Creek-Fort Story (JEBLCFS) would like to develop an economically viable energy conservation project that includes: Identify and evaluate solutions to repurpose/decentralize steam production assets for on-site power generation and battery storage, providing black-start capability during power outages. Convert steam mechanical systems to gas and/or electric systems in several of our facility. Investigate HVAC and LED lighting Energy Conservation Measures (ECMs) for several of our facilities. Investigate opportunities to expand facility-related control systems (FRCS) to support smart grid operations distribution network with a Supervisory Control and Data Acquisition (SCADA)-enabled system. Evaluate options to improve water resiliency for critical mission facilities. Construct a smart grid backbone to replace the aging manual electrical distribution system and optimize power generation to improve electrical resiliency across the installation. Hardening the electrical distribution system. This project positions the installation for future smart grid build-outs—including on-site renewable energy systems, battery storage, advanced controls, decentralization, and full steam plant repurposing—while converting lighting systems to LEDs to reduce energy consumption and utility costs. JEB LCFS plans to use a Utility Energy Service Contract (UESC) to implement these requirements at our facilities. We are surveying the interest of all electric, natural gas, and water distribution utilities to provide UESC services at multiple facilities and site (with corresponding utility accounts) within the utility’s franchise service territory. NAVFAC MidAtlantic intends to award a UESC Task Order under the GSA areawide contract (AWC). In the absence of an AWC, NAVFAC MidAtlantic will also consider awarding the UESC via a Separate Contract or a Basic Ordering Agreement (BOA). The Contractor (Utility/ Energy Service Company [ESCO]) shall select ECM subcontractors (including suppliers) on a competitive basis to the maximum practical extent consistent with the objectives and requirements of the contract. The selected utility shall provide the following during the UESC process: A Preliminary Assessment (PA) offered at no cost to the Government; following the PA, an Investment Grade Audit (IGA) may be requested Specific requirements for each assessment will be provided at the time of the request Financing (if applicable) which must be competed eProject Builder (ePB) is required for Task Order (TO) schedules; the TO Schedules should be provided for the PA, and the IGA Performance Assurance Plan to ensure ECMs are installed and perform as designed. If your company is prepared to pursue a UESC, please send an email to Michael N. Brice at michael.n.brice2.civ@us.navy.mil to indicate your interest. If I do not hear from you within 14 business days, I will consider that a negative response and that your company is not interested in pursuing a UESC for the noted facilities at this time. Please refrain from contacting other individuals at JEBLCFS at this time.

Original sector

Utilities

Location

Country

United States of America (USA)

State

Virginia

City

Virginia Beach

Source

Source

SAMGOVCO

URL

More Details

Record type

Tender

Sector

Commercial, Power Transmission, Energy Storage, Natural Gas, Power Generation (CCGT), Aerospace & Defense, Residential, Water Supply and Storage

Article published date

2026-09-30

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender