logo

FW Supply and Install - Primary Transformers - Multi Site 0338

The scope, dates and status of this tender. A free account opens every field.

Source: Open Contracting Data Standard (OCDS)

Tender
Active

Scottish Hydro Electric Power Distribution plc and Southern Electric Power Distribution plc (SSEN) intends to establish a multi-supplier Framework Agreement for the supply, delivery to site, off-loading onto prepared foundations, installation, preparation for service and commissioning of medium power oil immersed three-phase double-wound primary transformers. The transformers will operate at prim

Status
Bidding
Sector
Hydro, Oil and Gas, Manufacturing (Industrial), Power Generation (CCGT)
Location
United Kingdom
Updated
3 Nov 2026
Source
Open Contracting Data Standard (OCDS)

ConstructChat

Ask ConstructChat about FW Supply and Install - Primary Transformers - Multi Site 0338

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “FW Supply and Install - Primary Transformers - Multi Site 0338” is a tender record in Taiyo, linked to the Hydro sector. It is issued for works, goods, or services related to United Kingdom.

Participants

Not available for this record.

Status

Original status

active

Taiyo status

Bidding

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Scottish Hydro Electric Power Distribution plc and Southern Electric Power Distribution plc (SSEN) intends to establish a multi-supplier Framework Agreement for the supply, delivery to site, off-loading onto prepared foundations, installation, preparation for service and commissioning of medium power oil immersed three-phase double-wound primary transformers. The transformers will operate at primary voltages of 33kV, 22kV and 11kV, with power ratings ranging from approximately 1.5MVA to 20/40MVA. Each transformer shall be designed to operate as part of a parallel supply scheme and be capable of carrying full rated load continuously in the event of the loss of a partner transformer. Transformers shall also be capable of operating under reverse power flow conditions. The scope includes all associated equipment required to provide a fully operational installation, including, but not limited to: Cooling systems Tap changers Control and monitoring equipment Transformer protection interfaces Initial oil fill Installation and commissioning services As part of the procurement, SSEN intends to adopt a standardised and modular transformer design philosophy to support a "design once, build many" approach. The objective is to reduce design variation, improve manufacturing efficiency, enhance security of supply and support long-term network investment requirements.

Location

Country

United Kingdom (UK)

Source

Source

Open Contracting Data Standard (OCDS)

URL

More Details

Record type

Tender

Sector

Hydro, Oil and Gas, Manufacturing (Industrial), Power Generation (CCGT)

Article published date

2026-08-02

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender