FY23 & FY25 ANNUAL PEDESTRIAN ENHANCEMENTS
One of 10,000+ tenders Taiyo tracks in Oregon.
Source: Oregon Purchasing Group
The proposed work consists of furnishing all materials , labor , equipment , materials and supervision for construction of three midblock crossings meeting current Public Right - of - Way Accessibility Guidelines ( PROWAG ). These improvements generally consist of the construction of three mid - block pedestrian crossings , two
- Status
- Closed
- Sector
- Cement
- Location
- Oregon, United States of America
- Updated
- 3 Nov 2026
- Source
- Oregon Purchasing Group
ConstructChat
Ask ConstructChat about FY23 & FY25 ANNUAL PEDESTRIAN ENHANCEMENTS
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The proposed work consists of furnishing all materials , labor , equipment , materials and supervision for construction of three midblock crossings meeting current Public Right - of - Way Accessibility Guidelines ( PROWAG ). These improvements generally consist of the construction of three mid - block pedestrian crossings , two of which have designed RRFB ' s . In addition , the work also contains standard ADA compliant concrete flatwork , installation of a stormwater catch basin , pipe and manhole as well as the relocation of an existing bus stop . |
Location
Country | United States of America (USA) |
State | Oregon |
Source
Source | Oregon Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Cement |
Article published date | 2026-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
