FY25-CP-17 Country Club Road Culvert Replacement Project
The scope, dates and status of this tender. A free account opens every field.
The Bulloch County Board of Commissioners is accepting sealed bids from GDOT Prequalified Contractors for this project: FY25-CP-E17 Country Club Road Culvert Replacement Project. The project consists of demolishing the existing 42-In RCP culvert crossing and constructing a new reinforced concrete double barrel 5-Ft X 5-Ft box culvert system and roadway improvements including fill slope repair, roa
- Status
- Closed
- Sector
- Road, Cement
- Location
- Georgia, United States of America
- Updated
- 3 Nov 2026
- Source
- Georgia Procurement Registry
ConstructChat
Ask ConstructChat about FY25-CP-17 Country Club Road Culvert Replacement Project
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Bulloch County Board of Commissioners is accepting sealed bids from GDOT Prequalified Contractors for this project: FY25-CP-E17 Country Club Road Culvert Replacement Project. The project consists of demolishing the existing 42-In RCP culvert crossing and constructing a new reinforced concrete double barrel 5-Ft X 5-Ft box culvert system and roadway improvements including fill slope repair, roadway shoulder repair, subgrade construction, aggregate base construction, asphalt pavement construction, signing, striping, and new guardrail installation. The project is located along Country Club Road approximately 1.5 miles North from the intersection of Country Club Road and Cypress Lake Road near coordinates Latitude 32.414103o, Longitude -81.849150o. The project shall commence immediately following issuance of the notice to proceed. The Contractor shall achieve Substantial Completion of the work and certification of same within 120 (One Hundred Twenty) consecutive calendar days after the date of the issuance of the Notice to Proceed and shall achieve Final Acceptance of the work within 150 (One Hundred Fifty) consecutive calendar days after the date of the issuance of the Notice to Proceed. |
Original sector | Construction / Public Works |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Procurement Registry |
URL |
More Details
Record type | Tender |
Sector | Road, Cement |
Article published date | 2026-10-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Road tenders in United States
- Network Rail Commercial Property Maintenance Framework PSQ
- RFP - 2026-08-001
- SB011-27 822 Leonard Court Sinkhole Repair
- FREEDMAN GROVE ROAD ROADWAY IMPROVEMENTS
- RFP 26-20, On-Paving - Annual Contract
- SB013-26 Raised Intersections for Crogan Street at Perry Street and Clayton Street at Pike Street
- Road Work Bids- Resurface Macgruder Road
- Woodlawn Dr & Claxton Dairy Rd Roundabout
