Fy26 Brazos Island Harbor (Bih) Texas, Entrance And Jetty Channel Hopper Maintenance Dredging, Cameron County, Texas
Sector: Aerospace & Defense • Location: Texas, United States of America
Source: SAM.gov
The scope of the FY26 Brazos Island Harbor (BIH) Entrance and Jetty Channel maintenance dredging job will consist of dredging approximately 450,000 cubic yards of the Brazos Island Harbor, with five projected (5) options that relate to trail suction dredging and beach placement on South Padre Island. Schedule No. 1, Hopper dredging of BIH Entrance Channel station -13+000 to station -6+00; estimate
- Status
- Closed
- Sector
- Aerospace & Defense, Seaport, Residential, Commercial
- Location
- Texas, United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Fy26 Brazos Island Harbor (Bih) Texas, Entrance And Jetty Channel Hopper Maintenance Dredging, Cameron County, Texas
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | sources sought |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The scope of the FY26 Brazos Island Harbor (BIH) Entrance and Jetty Channel maintenance dredging job will consist of dredging approximately 450,000 cubic yards of the Brazos Island Harbor, with five projected (5) options that relate to trail suction dredging and beach placement on South Padre Island. Schedule No. 1, Hopper dredging of BIH Entrance Channel station -13+000 to station -6+00; estimated volume; 125,000 CY. And Hopper dredging of BIH Jetty Channel station -6+000 to 0+000; estimated volume: 225,000 CY. Placement Area: Near Shore Feeder Berm 1A/1B Options 1-3: Sea Turtle Trawling 15 days each. No additional time added to contract duration if awarded. Option 4: Beach Placement at two locations on South Padre Island in lieu of Near Shore Feeder Berm 1A/1B. If awarded, additional time of 14 calendar days will be added to contract duration. Option 5: Sea Turtle Trawling 15 days. No additional time added to contract duration if awarded. Dredging and beach placement option are subject to environmental windows for swimming and nesting sea turtles. Period of Performance: Complete the entire work ready for use not later than 120 calendar days after the date the Contractor receives the Notice to Proceed. Completion time for Options 1-5 is 14 calendar days. |
Original sector | Construction |
Location
Country | United States of America (USA) |
State | Texas |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Aerospace & Defense, Seaport, Residential, Commercial |
Article published date | 2026-01-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Aerospace & Defense tenders in United States of America
- Indigent Defense Services for Misdemeanor Cases Public Defender
- Notice of Intent to Award a NonCompetitive Procurement for Siemens Logistics High Speed Diverters
- This is a Notification Only Continuing OnCall Architecture and Engineering Consulting Services W00486
- Electronic Gate Replacement
- INFORMATION TECHNOLOGY IT CONTINUING CONSULTING SERVICES
- Airport Terminal HVAC Improvements Phase II Vestibule Upgrades ReBid
- NonExclusive Airport Rental Car Concession
- Procurement Consulting Services
