Fy27 Gnv Rebuild Cooling Towers
Sector: Residential • Location: Gainesville, Florida, United States of America
Source: SAM.gov
The Department of Veterans Affairs seeks a qualified contractor to provide repair and replacement services for cooling tower components and associated equipment. All work shall account for equipment degradation, environmental conditions, and safe accessibility in accordance with proper operations and maintenance practices. The contractor shall: • Procure new drift eliminators and all listed replac
- Status
- Prospective
- Sector
- Residential, Hospital, Manufacturing (Industrial), Commercial
- Location
- Gainesville, Florida, United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Fy27 Gnv Rebuild Cooling Towers
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | solicitation |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Department of Veterans Affairs seeks a qualified contractor to provide repair and replacement services for cooling tower components and associated equipment. All work shall account for equipment degradation, environmental conditions, and safe accessibility in accordance with proper operations and maintenance practices. The contractor shall: • Procure new drift eliminators and all listed replacement components for the cooling towers. • Deliver all materials to the Malcom Randall VA Medical Center, Gainesville, FL. • Install new drift eliminators, replacement panels, and all specified components. • Provide all additional parts, materials, and equipment necessary to restore both cooling towers to full operational condition in accordance with manufacturer specifications. This effort will be performed at the Malcolm Randall VA Medical Center in Gainesville, Florida. BAC Cooling Tower – Model BAC 3728A, Three (3) Cells The contractor shall remove defective components, install new replacement parts, and verify proper operation of each cooling tower cell. Any additional parts required to meet manufacturer specifications shall be furnished by the contractor. Required Replacement Components: • Quantity 3 – Shaft Assembly Kits (shaft, bearings, bushing, hardware) • Quantity 3 – Fan Assemblies • Quantity 3 – Cooling Tower Rated Motors • Quantity 3 – Belts • Quantity 3 – Motor Sheaves • Quantity 3 – Fan Sheaves • Quantity 6 – Sealer Tape (for leak mitigation) EVAPCO Cooling Tower – Model CTSN 8 351974, Six (6) Cells The contractor shall remove defective components, install new parts, and restore the cooling tower to full manufacturer operating specifications. All removed components must be properly disposed of off-site. The contractor shall also ensure safe access to framed louvers and other components requiring service. Required Replacement Components: • Quantity 4 – OEM Cooling Tower Motors • Quantity 6 – OEM Belts • Quantity 5 – Shaft Assembly Kits (shaft, bearings, bushing, hardware) • Quantity 2 – Fill Media • Quantity 2 – Drift Eliminator Kits • Quantity 32 – Framed Louvers |
Original sector | Not Identified |
Location
Country | United States of America (USA) |
State | Florida |
City | Gainesville |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Residential, Hospital, Manufacturing (Industrial), Commercial |
Article published date | 2026-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
