logo

Gaoa Blanchard Springs Caverns Tunnel Rehabilitation In Ozark-St. Francis Nf

One of 8,448 tenders Taiyo tracks in Arkansas.

Source: SAM.gov

Tender
Combined Synopsis/Solicitation

On October 26, 2026, amendment 0004 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following: 1. Post the final RFI Q&A. This amendment must be acknowledged and submitted with your proposal. **************************************************************************************

Status
Closed
Sector
Cement, Tunnel, Raw Materials, Commercial, Residential
Location
Fifty Six, Arkansas, United States of America
Updated
3 Nov 2026
Source
SAM.gov

ConstructChat

Ask ConstructChat about Gaoa Blanchard Springs Caverns Tunnel Rehabilitation In Ozark-St. Francis Nf

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Gaoa Blanchard Springs Caverns Tunnel Rehabilitation In Ozark-St. Francis Nf” is a tender record in Taiyo, linked to the Cement sector. It is issued for works, goods, or services related to Fifty Six, Arkansas, United States of America.

Participants

Not available for this record.

Status

Original status

combined synopsis/solicitation

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

On October 26, 2026, amendment 0004 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following: 1. Post the final RFI Q&A. This amendment must be acknowledged and submitted with your proposal. ************************************************************************************************************************************** On October 13, 2026, amendment 0004 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following: 1. Extends the proposal due date from 10/14/2026 to 10/29/2026. This amendment must be acknowledged and submitted with your proposal. *************************************************************************************************************************************** On September 30, 2026, amendment 0003 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following: 1. Extends the proposal due date from 09/30/2026 to 10/14/2026. This amendment must be acknowledged and submitted with your proposal. *************************************************************************************************************************************** On September 17, 2026, amendment 0002 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following: 1. Post RFI questions and answers labeled C05a RFI QA 1240BH26R0013. 2. Post pre-bid sign in sheet labeled C05b Site Visit Sign In 1240BH26R0013. This amendment must be acknowledged and submitted with your proposal. *********************************************************************************************************************************************** On August 12, 2026, amendment 0001 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following: 1. Post Golder Specifications labeled “C04m Attachment 11 Golder 1240BH26R0013.” This SF30 must be acknowledged and submitted with your proposal. *********************************************************************************************************************************************** This project includes all labor, equipment, supplies, testing & inspections, and incidentals necessary for the Blanchard Springs Caverns (BSC) Dripstone and Discovery Trail Infrastructure repairs and safety upgrades. All work shall conform to the attached Drawings and Specifications. All work shall be performed by qualified and licensed contractors for all trades applicable. Work includes but is not limited to structural stabilization of tunnel entrance and exits, disposal and removal of existing supports, masonry repairs, Installation of Instrumentation & monitoring equipment, replacement of existing air lock doors at entrance and exits, replacement of existing security doors at entrance and exits, replacement of existing suspended ceiling system, components, and associated ductwork, replacement of existing bypass tunnel door, replacement of existing lighting and distribution system components, replacement of existing safety handrails, and replacement of the existing mine phone system and components.

Original sector

Construction

Location

Country

United States of America (USA)

State

Arkansas

City

Fifty Six

Source

Source

SAM.gov

URL

More Details

Record type

Tender

Sector

Cement, Tunnel, Raw Materials, Commercial, Residential

Article published date

2026-10-27

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender