Gaoa Blanchard Springs Caverns Tunnel Rehabilitation In Ozark-St. Francis Nf
Sector: Tunnel • Location: Fifty Six, Arkansas, United States of America
Source: SAM.gov
On August 12, 2026, amendment 0001 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following: 1. Post Golder Specifications labeled “C04m Attachment 11 Golder 1240BH26R0013.” This SF30 must be acknowledged and submitted with your proposal. **************************************
- Status
- Prospective
- Sector
- Tunnel, Cement, Raw Materials, Residential, Commercial
- Location
- Fifty Six, Arkansas, United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Gaoa Blanchard Springs Caverns Tunnel Rehabilitation In Ozark-St. Francis Nf
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | combined synopsis/solicitation |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | On August 12, 2026, amendment 0001 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following: 1. Post Golder Specifications labeled “C04m Attachment 11 Golder 1240BH26R0013.” This SF30 must be acknowledged and submitted with your proposal. *********************************************************************************************************************************************** This project includes all labor, equipment, supplies, testing & inspections, and incidentals necessary for the Blanchard Springs Caverns (BSC) Dripstone and Discovery Trail Infrastructure repairs and safety upgrades. All work shall conform to the attached Drawings and Specifications. All work shall be performed by qualified and licensed contractors for all trades applicable. Work includes but is not limited to structural stabilization of tunnel entrance and exits, disposal and removal of existing supports, masonry repairs, Installation of Instrumentation & monitoring equipment, replacement of existing air lock doors at entrance and exits, replacement of existing security doors at entrance and exits, replacement of existing suspended ceiling system, components, and associated ductwork, replacement of existing bypass tunnel door, replacement of existing lighting and distribution system components, replacement of existing safety handrails, and replacement of the existing mine phone system and components. |
Original sector | Construction |
Location
Country | United States of America (USA) |
State | Arkansas |
City | Fifty Six |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Tunnel, Cement, Raw Materials, Residential, Commercial |
Article published date | 2026-08-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Tunnel tenders in United States of America
- RFQ S20221 BART Silicon Valley Phase II Extension Program Tunnel Trackwork Contract
- SFPUC Upcoming Contracting Opportunity - Folsom Area Stormwa...
- Kansas and Marin Streets Wet Weather Conveyance Tunnel [CANC...
- Mountain Tunnel Improvements Project [BID TABULATION]
- Request/Notice for Qualifications for Biosolids Digester Fac...
- Request/Notice for Qualifications for Biosolids Digester Fac...
- Request/Notice for Qualifications for Biosolids Digester Fac...
- Mountain Tunnel Improvements Project [BID TABULATION]
