logo

Gaoa Kents Lk. Cg Reconstruction, Fishlake Nf, Utah

Combined synopsis/solicitation · Utah

Source: SAM.gov

Tender
Combined Synopsis/Solicitation

On September 24, 2026, amendment 0003 to solicitation 1240LT26Q0106 - GAOA Kents Lk. CG Reconstruction, Fishlake National Forest has been posted to SAM.gov and accomplished the following: 1. Post RFI questions and answers labeled C05a Final RFI QA 1240LT26Q0106. 2. Post site visit sign in sheet labeled C05b Site Visit Sign In 1240LT26Q0106. 3. UTILITY TABLES SHALL BE GOVERNMENT FURNSIHED under Lin

Status
Prospective
Sector
Commercial, Cement, Power Transmission, Waste Processing and Treatment, Water Supply and Storage, Government, Raw Materials, Power Generation (CCGT), Residential
Location
Beaver, Utah, United States of America
Updated
3 Nov 2026
Source
SAM.gov

ConstructChat

Ask ConstructChat about Gaoa Kents Lk. Cg Reconstruction, Fishlake Nf, Utah

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Gaoa Kents Lk. Cg Reconstruction, Fishlake Nf, Utah” is a tender record in Taiyo, linked to the Commercial sector. It is issued for works, goods, or services related to Beaver, Utah, United States of America.

Participants

Not available for this record.

Status

Original status

combined synopsis/solicitation

Taiyo status

Prospective

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

On September 24, 2026, amendment 0003 to solicitation 1240LT26Q0106 - GAOA Kents Lk. CG Reconstruction, Fishlake National Forest has been posted to SAM.gov and accomplished the following: 1. Post RFI questions and answers labeled C05a Final RFI QA 1240LT26Q0106. 2. Post site visit sign in sheet labeled C05b Site Visit Sign In 1240LT26Q0106. 3. UTILITY TABLES SHALL BE GOVERNMENT FURNSIHED under Line 6 of the notes on page D12 of the drawings is removed in its entirety. 4. Part 2 - Products from specifications SECTION 323125 - COMPOSITE WOOD FENCE is removed in its entirety. See file labeled C05c Attachment 2 Spec 1240LT26Q0106 092426. 5. Extends the due date for quotes from 09/23/2026 to 10/15/2026. This amendment must be acknowledged and submitted with your proposal. ********************************************************************************************************************************************** On September 22, 2026 the due date for quotes was extended to October 8, 2026. An amendment will follow that will post the questions and answers thta were received. *********************************************************************************************************************** On September 3, 2026, amendment 0002 to solicitation 1240LT26Q0106 - GAOA Kents Lk. CG Reconstruction at Fishlake National Forest has been posted to SAM.gov and accomplished the following: 1. Post the RFI Q&A labeled C05a RFI Q&A 1240LT26Q0106. 2. Post the update Specifications labeled C05b SPECS KentsLakeCG_FINAL_5.2.2026 3. Post the updated SOI labeled C05c SOI Kents Lake 05.18.2026 This amendment must be acknowledged and submitted with your proposal. *********************************************************************************************************************************************** On August 19, 2026, amendment 0001 to solicitation 1240LT26Q0106 - GAOA Kents Lk. CG Reconstruction, Fishlake National Forest has been posted to SAM.gov and accomplished the following: Post updated SOI labeled C04a Attachment 1 SOI 1240LT26Q0106. This SF30 must be acknowledged and submitted with your proposal. ************************************************************************************************************************************************* The Kent’s Lake Campground Reconstruction Project, part of the Great American Outdoors Act (GAOA) program, will restore the campground’s natural environment while updating facilities to support increasing recreational use and modern vehicle requirements. The work includes demolition of existing structures, installation of new concrete features, upgraded family and tent campsites, improved water and sewer infrastructure, roadway and drainage enhancements, rock and retaining wall construction, fencing and gates, new signage, and site restoration including grading, surfacing, and seeding. The project aims to enhance visitor safety, accessibility, and resource protection while preserving the forest’s natural character.

Original sector

Construction

Location

Country

United States of America (USA)

State

Utah

City

Beaver

Source

Source

SAM.gov

URL

More Details

Record type

Tender

Sector

Commercial, Cement, Power Transmission, Waste Processing and Treatment, Water Supply and Storage, Government, Raw Materials, Power Generation (CCGT), Residential

Article published date

2026-09-25

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender