logo

Gaseous Hydrogen Pressure Reduction Station

One of 10,000+ tenders Taiyo tracks in United Kingdom.

Source: GOV.UK

Tender
Active

HSE require a gaseous hydrogen pressure reduction station for use during a research test programme. The PRS will be connected to a bulk hydrogen supply up to 500 barg. The PRS should be able to control a flow of gaseous hydrogen at a set flow rate within the range 20 - 400 g/s. The system should ...

Status
Bidding
Sector
Road, Hydrogen, Manufacturing (Industrial)
Location
United Kingdom
Updated
3 Nov 2026
Source
GOV.UK

ConstructChat

Ask ConstructChat about Gaseous Hydrogen Pressure Reduction Station

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

4 Q
The tender “Gaseous Hydrogen Pressure Reduction Station” is a tender record in Taiyo, linked to the Road sector. It is issued for works, goods, or services related to United Kingdom.

Participants

Not available for this record.

Status

Original status

active

Taiyo status

Bidding

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

HSE require a gaseous hydrogen pressure reduction station for use during a research test programme. The PRS will be connected to a bulk hydrogen supply up to 500 barg. The PRS should be able to control a flow of gaseous hydrogen at a set flow rate within the range 20 - 400 g/s. The system should ...

Budget

Location

Country

United Kingdom (UK)

Source

Source

GOV.UK

URL

More Details

Record type

Tender

Sector

Road, Hydrogen, Manufacturing (Industrial)

Article published date

2026-02-13

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender