GBC - Weyside Urban Village - Phase 1 and 3 Infrastructure
Complete · United Kingdom
Source: Find a Tender Service (UK)
The Works The works for this project involve the infrastructure works relating to the Weyside Urban Village Phases 1 and 3 development plots. In summary, the Works under this Contract will comprise: • Necessary surveys, and investigations and monitoring. • Demolition of remaining buildings (including the existing Guildford Council Depot) • Vegetation clearance, tree felling and site strip • Topsoi
- Status
- Closed
- Sector
- Road, Oil and Gas, Power Transmission, Raw Materials, Power Generation (CCGT), Automotive, Water Supply and Storage
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Find a Tender Service (UK)
ConstructChat
Ask ConstructChat about GBC - Weyside Urban Village - Phase 1 and 3 Infrastructure
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Works The works for this project involve the infrastructure works relating to the Weyside Urban Village Phases 1 and 3 development plots. In summary, the Works under this Contract will comprise: • Necessary surveys, and investigations and monitoring. • Demolition of remaining buildings (including the existing Guildford Council Depot) • Vegetation clearance, tree felling and site strip • Topsoil stripping • Sitewide remediation of contamination (where required) • Site platform and levelling • Drainage infrastructure, pipework, manholes, attenuation tanking, petrol interceptors • Swales and attenuation basins • Surface water outfalls • Utility infrastructure, ducting, chambers, pipework • Highway formations • Signage, markings, street furniture, street lighting • Non-motorised Vehicles works, encompassing various pedestrian and cycle path improvements • S278 Junction Works • Maintain the reptile translocation fencing and associated inspections Location Location of Project: • Area named Phase 1: Weyside Urban Village (Slyfield regeneration Programme), Land to the south of Bellfield Allotments, Guildford, GU1 1QG. • Area named Phase 3: Weyside Urban Village (Slyfield regeneration Programme), existing Guildford Borough Council’s Depot site, Guildford GU1 1QE. • Area named NMU: Farm Close, Section 106 ref 6, Mangles Road Section 106 ref 10.4 and Towpath improvements section 106 ref 8-9 Works by Others During these works there are likely to be the following works being undertaken by the Employer and statutory undertakers on and or around the site, including but not limited to; • Ground water monitoring. • Other works may be occurring adjacent to the site on the wider master site plan. • Ecological watching brief by an independent ecologist • Archaeological watching brief by an independent archaeologist • Utilities works / diversions (which do not form part of the Scope of these works). • General s278 Highways works • Works associated with the relocation of the Sewerage Treatment Works • Off site demolitions |
Location
Country | United Kingdom (UK) |
Source
Source | Find a Tender Service (UK) |
URL |
More Details
Record type | Tender |
Sector | Road, Oil and Gas, Power Transmission, Raw Materials, Power Generation (CCGT), Automotive, Water Supply and Storage |
Article published date | 2026-10-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Road tenders in United Kingdom
- 2024-01-05 09:00 - QBE129 Haverhill to Riverwalk School, Bury St Edmunds
- Tender for Play Area Works within the Borough of Ards and North Down
- OSPAR Relational Database for the implementation of Recommendations on the List of threatened and/or declining habitats and species
- QSB209, 0900 2024-01-04, Bury St Edmunds to Olive AP Academy, Stowmarket (4 seated vehicle)
- ID 6246207 - SEUPB - Information Services - Data Protection Officer Advisory Services
- T26-074CAP PEACEPLUS War Memorials Contractors Combined PQQ ITT Reissue
- 2026-05-07 09:00 - QBE393 Haverhill to Reboot Bury St Edmunds
- QIP066 09:00 2026-05-26 Shotley, Suffolk to Haughley Suffolk & Norwich Road, Ipswich, Suffolk
