logo

General Hauling Services

Closed · Missouri · Last reported Mar 2026

Source: Missouri Purchasing Group

Tender
Closed

1 . The City of St . Peters is seeking bids for the supply of general hauling services , to be supplied on an as needed basis . Hauling services shall include the supply of up totwelve ( 12 ) tandem axle dump trucks with operators per day . Trucks and drivers will be used to perform hauling services fo

Status
Closed
Sector
Road, Commercial, Cement
Location
Missouri, United States of America
Updated
3 Nov 2026
Source
Missouri Purchasing Group

ConstructChat

Ask ConstructChat about General Hauling Services

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “General Hauling Services” is a tender record in Taiyo, linked to the Road sector. It is issued for works, goods, or services related to Missouri, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

1 . The City of St . Peters is seeking bids for the supply of general hauling services , to be supplied on an as needed basis . Hauling services shall include the supply of up totwelve ( 12 ) tandem axle dump trucks with operators per day . Trucks and drivers will be used to perform hauling services for asphalt paving , concrete pavement , concrete curb and gutter excavation , and or general material hauling operations for City construction projects . 2 . In general , hauling services will be required Monday through Friday , from 6 : 00 AM to 3 : 30 PM , however , hauling services may be required for extended hours with little or no prior notice , as well as on weekends and at night . The City of St . Peters does not guarantee an eight ( 8 ) hour working day for the trucks and drivers requested . 3 . Orders for hauling services shall generally be made by the City of St . Peters , a minimum of twenty - four ( 24 ) hours prior to the required reporting time . Hauling service orders will be submitted verbally over the phone . The service order shall include the number of trucks and drivers required , reporting time , job location and estimated number of working hours required . The number of working hours required is an estimate only . The City of St . Peters reserves the right to reduce or increase the amount of working hours required , at any time . The hauling service provider shall advise the City , a maximum of one ( 1 ) hour after the service order is submitted , to confirm receipt of the order and number of trucks that will be provided . 4 . The City of St . Peters shall notify the supplier a minimum of two ( 2 ) hours prior to the scheduled reporting time stated in the service order , in the event that order is cancelled . Notification can be in writing or verbal . The City of St . Peters shall pay a maximum oftwo ( 2 ) hours show up time , for each truck ordered , in the event notification is not given within two ( 2 ) hours prior to the ordered start time , or if services are terminated within two ( 2 ) hours after trucks have reported . 5 . All trucks provided by the supplier shall be legally operable with in the State of Missouri , shall report in full working order and be equipped to perform all aspects of asphalt paving , pavement milling , pavement excavation and general material hauling . Trucks supplied , which do not meet these requirements , will be removed from the job immediately upon discovery by the City of St . Peters . Said removed trucks may not return to the job until the problem is corrected . No minimum payments will be made for trucks that do not report in a condition to perform the job required . Payment will not be made for time required to make the truck ready to perform the work operations . 6 . All drivers provided shall have current and valid State of Missouri commercial drivers licenses ( CDLs ) appropriate for the truck the driver is operating . All drivers shall be experienced with the performance of hauling operations required for asphalt paving , pavement milling , pavement excavation and general material hauling . 7 . The City reserves the right to terminate the services of any truck or driver , at any time during work operations , for any reason . 8 . The City of St . Peters reserves the right to require any truck or driver not be used to perform job operations in the future , for any reason .

Location

Country

United States of America (USA)

State

Missouri

Source

Source

Missouri Purchasing Group

URL

More Details

Record type

Tender

Sector

Road, Commercial, Cement

Article published date

2026-04-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender