Generator Project - Happy Camp
Bids closed Feb 2026 · California · Last reported Jan 2026
Source: California Purchasing Group
Task One – Trenching / Concrete There will be approximately 100 feet of trenching , and a cultural monitor on site at all times of soil disturbance . Must install a 15 ’ X25 ’ X4 ” concrete slab , with # 5 rebar at 18 ” on center . Concrete must meet 3500 PSI compression strength , and must take three cylinders
- Status
- Closed
- Sector
- Steel, Cement
- Location
- California, United States of America
- Updated
- 3 Nov 2026
- Source
- California Purchasing Group
ConstructChat
Ask ConstructChat about Generator Project - Happy Camp
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Task One – Trenching / Concrete There will be approximately 100 feet of trenching , and a cultural monitor on site at all times of soil disturbance . Must install a 15 ’ X25 ’ X4 ” concrete slab , with # 5 rebar at 18 ” on center . Concrete must meet 3500 PSI compression strength , and must take three cylinders for testing . Task Two – Installation All wiring , conduits , automatic switch gear , and other electrical equipment will be properly sized and installed in accordance with Federal , State , and Local codes . All wiring , conduits , and other electrical equipment will be installed in a neat and organized fashion . Unsatisfactory work will not be accepted by the owner until rectified by the Contractor at their sole expense . All wiring and equipment will be clearly and properly marked to know their purpose . Contractor must supply and install appropriately sized propane fuel tank / tanks and all necessary plumbing . Task Three – Clean up All manuals and information on the unit will be submitted to the owner at the completion of the project . A general walk - through of the operation will be done with Tribal employees . All equipment will be inspected by an Owner representative throughout the project , and testing will be completed before the project is considered satisfactory . The contractor will be responsible for the initial start - up of the generator . Any damage to the facility and / or equipment as a direct result of the project will be repaired by the Contractor . All remaining project debris and materials will be properly disposed of by the Contractor at this time , and the area will be left in a condition equal to or better than found . |
Location
Country | United States of America (USA) |
State | California |
Source
Source | California Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Steel, Cement |
Article published date | 2026-03-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Steel tenders in United States of America
- Construction Materials Testing and Inspection Services for Thousand Oaks Boulevard Pedestrian Crossing CI 5398
- Street Construction Materials
- Jail Courthouse Walkway Project
- RFP 887702021MF Rapid Response Fire Boat for Norfolk FireRescue
- Millbrae Warehouse Loading Dock Repair
- Biosolids Digester Facilities - Southeast Treatment Plant T-...
- Marin Street Sewer Replacement - BID TABULATION
- Southeast Water Pollution Control Plant HVAC and Mechanical ...