Generator Purchase , Install , Service at Air National Guard
One of 7,283 tenders Taiyo tracks in Kentucky.
Source: Kentucky Purchasing Group
Line CL Description Quantity UOM Unit Cost Line Total or Contract Amnt 1 Generator removal , purchase , install , service 0 . 00000 EA Extended Description This solicitation is for the removal of current generator and the purchase , installation and start up / testing of a new generator , located at 1101 Grade
- Status
- Closed
- Sector
- Energy Storage, Power Generation (CCGT), Water Supply and Storage, Commercial, Residential, Road
- Location
- Kentucky, United States of America
- Updated
- 3 Nov 2026
- Source
- Kentucky Purchasing Group
ConstructChat
Ask ConstructChat about Generator Purchase , Install , Service at Air National Guard
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Line CL Description Quantity UOM Unit Cost Line Total or Contract Amnt 1 Generator removal , purchase , install , service 0 . 00000 EA Extended Description This solicitation is for the removal of current generator and the purchase , installation and start up / testing of a new generator , located at 1101 Grade Lane , Bldg # 400 , Louisville KY . SCOPE OF WORK Work will take place at Kentucky Air National Guard , at building # 400 ( behind the building , West side Flight Line ). Once the generator has been ordered and delivered , the electrical contractor will come on site to disconnect the existing generator from current source of power . Once disconnected , the old generator will be removed and hauled away . Then the new generator will be installed . After installation of the new generator , a Certified technician will come on site to perform the standard CAT startup procedure and checklist , checking for proper amperage , voltage , hertz , and engine / alternator temperatures . After the engine has been brought to operating temperature , a 4 - hour load bank test will begin , running the engine under load for onehour increments . One hour at 25 % load , one hour at 50 % load , one hour at 75 % load , and finally , one hour at 100 % load . Once completed , the generator will be allowed to cool down , and startup checklist signed off by Certified technician . All work on base to be completed during the hours of 7 : 30am EST to 4 : 00pm EST , Monday through Friday excluding state holidays . The new generator needs to meet the below specifications : EPA STATIONARY EMERGENCY 60HZ 208 VOLT ( WYE ) STANDBY POWER 60Hz , 60 Kw D60GC UL 2200 LISTED PACKEAGE GEN SET ADEM A4 GOVERNOR PERMANENT MAGNET GENERATOR ALT SPACE HEATER 105C TEMP RISE OVER 40C AMB ALT M2233L4 JD GEN MTG & DUCT PLATE 1 INTEGRAL TANK BASE , 24HR 5 GALLON SPILL CONTAINMENT AUDIO & FUEL ALARM ( 90 % LEVEL ) VENT PIPE STD EMERGENCY FUEL VENT PIPE UL - 3 ” SA LEVEL 2 ENCLOSURE WHITE B1 ENCLOSURE DC LIGHTS NFPA BUNDLE GEN RUNNING & FAULT RELAY PANEL MOUNTED AUDIBLE ALARM EXTERNAL EMERGENCY STOP WET BATTERY BATTERY CHARGER 10 AMP JACKET WATER HEATER CURRENT TRANSFORMER 250 : 5 LOW COOLANT LEVEL SHUTDOWN 1 250A LS 100 % RATED BREAKER NEUTRAL BAR 150A & 250A AUZILIARY CONTACTS STANDARD RADIATOR REMOTE E - STOP BUTTON REMOTE ANNUNCIATOR STD TEST – PKG GEN SET 0 . 8 PF PGS TEST REPORT @ 0 . 8 PF |
Location
Country | United States of America (USA) |
State | Kentucky |
Source
Source | Kentucky Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Energy Storage, Power Generation (CCGT), Water Supply and Storage, Commercial, Residential, Road |
Article published date | 2026-05-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Energy Storage tenders in United States of America
- HOUSEHOLD SINGLEUSE RECHARGEABLE BATTERY COLLECTION AND RECYCLING SERVICES
- BATTERIES FOR SURVEILLANCE EQUIPMENT
- Southeast Water Pollution Control Plant Power Feed and Prima...
- Flashlights and Batteries
- IFB 970302022LW Flashlights and Accessories
- Power Utility Rate Consulting Services for 2021 Electric Rates Study
- RFP - Portable Mass Spectrometer Device
- Southeast Water Pollution Control Plant Power Feed and Prima...
