GGC Athletics Baseball and Softball Maintenance
One of 10,000+ tenders Taiyo tracks in Georgia.
Source: Georgia Purchasing Group
The company must be certified in sports field management and sports field builder . Maintenance Expectations : Field Surface & Playing Areas • Both the baseball and softball facilities at GGC feature natural grass playing surfaces ( Bermuda mixed with Rye ) and are built with advanced irrigation and drainage system
- Status
- Closed
- Sector
- Water Supply and Storage, Fertilizers, Waste Processing and Treatment
- Location
- Georgia, United States of America
- Updated
- 3 Nov 2026
- Source
- Georgia Purchasing Group
ConstructChat
Ask ConstructChat about GGC Athletics Baseball and Softball Maintenance
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The company must be certified in sports field management and sports field builder . Maintenance Expectations : Field Surface & Playing Areas • Both the baseball and softball facilities at GGC feature natural grass playing surfaces ( Bermuda mixed with Rye ) and are built with advanced irrigation and drainage systems . • The turf , infield skin ( dirt ) areas , foul territory , and warning track must be maintained to safe , consistent , playable conditions — free of hazards such as holes , uneven surfaces , debris or standing water . • Grass areas require regular mowing , edging , fertilization , irrigation , pest / weed control , aeration , topdressing , and overseeding ( as needed ) to maintain healthy turf and consistent playability . o GGC is responsible for regular mowing , edging , and running irrigation schedules unless requested otherwise • Infield dirt / skinned areas require regular dragging ( GGC responsible for on a regular basis unless requested otherwise ), leveling / laser grading , moisture management , free of compaction , and proper transitions between turf and skin . • Drainage must be functional at all times : surface water must not pond ; after rain events the fields must be restored to playable condition in a timely manner GGC responsible for on a regular basis unless requested otherwise Maintenance Schedule & Reporting • A detailed maintenance schedule ( see below ) should be provided , covering daily , weekly , monthly , seasonal and annual tasks ( e . g ., recommended mowing frequency , infield skin grooming , aeration , topdressing , overseeding , fertilizer / pesticide application , drainage checks ). • The contractor must provide regular reports to GGC ’ s Athletics Facilities Manager ( or equivalent ) on completed tasks , field conditions , and any issues or repairs required . • Off ‐ season tasks : deep conditioning of turf and infield skin , major repair / reshaping , fencing or drainage improvement , and preparing fields for next season . • The contractor must coordinate with GGC ’ s facility calendar ( practices , games , special events ) to ensure fields are accessible to perform maintenance and adjust maintenance windows accordingly . |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Fertilizers, Waste Processing and Treatment |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
