logo

Gilead Hill School Roof Replacement

Closed · Connecticut · Last reported Feb 2026

Source: Connecticut Purchasing Group

Tender
Closed

The project consists of a full tear off and replacement of low slope roof within the scope of work areas . The existing roof consists of areas of TPO single - ply roofing , which will be removed to the existing deck and replaced with a new fully adhered EPDM roofing system . Existing flashings , roof

Status
Closed
Sector
Metal, Steel, Cement
Location
Connecticut, United States of America
Updated
3 Nov 2026
Source
Connecticut Purchasing Group

ConstructChat

Ask ConstructChat about Gilead Hill School Roof Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Gilead Hill School Roof Replacement” is a tender record in Taiyo, linked to the Metal sector. It is issued for works, goods, or services related to Connecticut, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The project consists of a full tear off and replacement of low slope roof within the scope of work areas . The existing roof consists of areas of TPO single - ply roofing , which will be removed to the existing deck and replaced with a new fully adhered EPDM roofing system . Existing flashings , roof edge metal , coping and roof expansion joints will be replaced . The existing roof decks consist of areas of steel roof decking and one area of concrete deck at the connector to the north wing . Roof drains will be removed for the installation of new roof drains and new overflow roof drains . Some roof drain locations will be abandoned , and some will be moved , new storm piping will be required to connect back to the existing storm drain stack / line . A secondary roof overflow piping system , overflow scupper or gutter system will be installed to provide primary and secondary drainage . New steel roof decking will need to be added to patch holes for the removal of roof top equipment , roof drains , and at existing skylight locations . Through the wall secondary drainage overflow scuppers will be installed at all bifunctional roof drains . There is serviceable equipment within 10 ’ of the roof edge and skylights so a portable roof safety railing system will need to be installed . Some of the abandoned existing roof top equipment will be removed . The new EPDM roofing system will require provisions for roof edge heights and the associated roof flashings . Masonry restoration will be required at the existing gym walls to provide new flashing and counter flashing . J . Roof cores have been completed to evaluate the composition of the existing roofs . An abatement work plan will need to be developed to identify any suspect areas and quantify any required abatement prior to the commencement of roof demolition . There is a possibility of that existing ACM flashings will need to be abated under the asbestos abatement work plan .

Location

Country

United States of America (USA)

State

Connecticut

Source

Source

Connecticut Purchasing Group

URL

More Details

Record type

Tender

Sector

Metal, Steel, Cement

Article published date

2026-03-27

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender