Gilead Hill School Roof Replacement
Closed · Connecticut · Last reported Feb 2026
Source: Connecticut Purchasing Group
The project consists of a full tear off and replacement of low slope roof within the scope of work areas . The existing roof consists of areas of TPO single - ply roofing , which will be removed to the existing deck and replaced with a new fully adhered EPDM roofing system . Existing flashings , roof
- Status
- Closed
- Sector
- Metal, Steel, Cement
- Location
- Connecticut, United States of America
- Updated
- 3 Nov 2026
- Source
- Connecticut Purchasing Group
ConstructChat
Ask ConstructChat about Gilead Hill School Roof Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The project consists of a full tear off and replacement of low slope roof within the scope of work areas . The existing roof consists of areas of TPO single - ply roofing , which will be removed to the existing deck and replaced with a new fully adhered EPDM roofing system . Existing flashings , roof edge metal , coping and roof expansion joints will be replaced . The existing roof decks consist of areas of steel roof decking and one area of concrete deck at the connector to the north wing . Roof drains will be removed for the installation of new roof drains and new overflow roof drains . Some roof drain locations will be abandoned , and some will be moved , new storm piping will be required to connect back to the existing storm drain stack / line . A secondary roof overflow piping system , overflow scupper or gutter system will be installed to provide primary and secondary drainage . New steel roof decking will need to be added to patch holes for the removal of roof top equipment , roof drains , and at existing skylight locations . Through the wall secondary drainage overflow scuppers will be installed at all bifunctional roof drains . There is serviceable equipment within 10 ’ of the roof edge and skylights so a portable roof safety railing system will need to be installed . Some of the abandoned existing roof top equipment will be removed . The new EPDM roofing system will require provisions for roof edge heights and the associated roof flashings . Masonry restoration will be required at the existing gym walls to provide new flashing and counter flashing . J . Roof cores have been completed to evaluate the composition of the existing roofs . An abatement work plan will need to be developed to identify any suspect areas and quantify any required abatement prior to the commencement of roof demolition . There is a possibility of that existing ACM flashings will need to be abated under the asbestos abatement work plan . |
Location
Country | United States of America (USA) |
State | Connecticut |
Source
Source | Connecticut Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Metal, Steel, Cement |
Article published date | 2026-03-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Metal tenders in United States of America
- Token Creek Roof Replacements
- HVAC Ice Machine Servicing and Sheet Metal Fabrication
- Jail Courthouse Walkway Project
- RFP 887702021MF Rapid Response Fire Boat for Norfolk FireRescue
- Various Locations Sewer Replacement No. 9 [BID TABULATION]
- Millbrae Warehouse Loading Dock Repair
- Biosolids Digester Facilities - Southeast Treatment Plant T-...
- Electrical (C-10 License), San Francisco, San Mateo, Santa C...
