logo

GL RFCA Uxbridge ARC Boiler Replacement

The scope, dates and status of this tender. A free account opens every field.

Source: Find a Tender Service (UK)

Tender
Active

Below threshold procurement - by invitation only This project consists of the replacement of the existing central heating boiler plant and equipment at Army Reserve Centre, Honeycroft Hill, Uxbridge UB10 9NH. Uxbridge ARC comprises office accommodation, a large hall, Officers Mess, bar and other associated spaces. There is a main plant room in the roof space that provides domestic hot water and h

Status
Bidding
Sector
Water Supply and Storage, Residential, Road, Commercial
Location
United Kingdom
Updated
3 Nov 2026
Source
Find a Tender Service (UK)

ConstructChat

Ask ConstructChat about GL RFCA Uxbridge ARC Boiler Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

4 Q
The tender “GL RFCA Uxbridge ARC Boiler Replacement” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to United Kingdom.

Participants

Not available for this record.

Status

Original status

active

Taiyo status

Bidding

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Below threshold procurement - by invitation only This project consists of the replacement of the existing central heating boiler plant and equipment at Army Reserve Centre, Honeycroft Hill, Uxbridge UB10 9NH. Uxbridge ARC comprises office accommodation, a large hall, Officers Mess, bar and other associated spaces. There is a main plant room in the roof space that provides domestic hot water and heating to all the facilities on the Uxbridge ARC site. The existing plant consists of 3 No. Hamworthy Wessex 50 gas fired boilers, 1 No gas fired hot water storage heater and 1 No. hot water storage vessel, associated pumps, expansion vessels and controls. The boiler flue routes through a lightwell to discharge at roof level. New communal boilers and replacement pumps are to be provided in the roof space plantroom. Gas to the plant room runs through the roof space to enter the plant room at low level by the existing boilers. This then rises to high level to feed the gas fired water heater. A new gas solenoid valve and fire safety system will be required in the plant room. For more information about this opportunity, please visit the eSourcing portal at: https://www.delta-esourcing.com/tenders/UK-UK-London:-Boiler-installation-work./QM87SM5GVW To respond to this opportunity, please click here: https://www.delta-esourcing.com/respond/QM87SM5GVW

Budget

Location

Country

United Kingdom (UK)

Source

Source

Find a Tender Service (UK)

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Residential, Road, Commercial

Article published date

2026-09-21

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender