logo

Glennville Sewer Improvements for Zone 3 (PE26123

The scope, dates and status of this tender. A free account opens every field.

Tender
Under Evaluation

Sealed bids for construction of Glennville Sewer Improvements Project (Zone 3) will be received until April 1st, 2026 at 2:00 PM at the City of Glennville City Hall at 134 S. Veterans Blvd, Glennville, GA 30427 at which time and place they will be publicly opened and read. Any bid received after said time and date will not be considered by the Owner. No bid may be withdrawn after the closing time

Status
Closed
Sector
Road, Power Transmission, Power Generation (CCGT), Government, Waste Processing and Treatment
Location
Georgia, United States of America
Updated
3 Nov 2026
Source
Georgia Procurement Registry

ConstructChat

Ask ConstructChat about Glennville Sewer Improvements for Zone 3 (PE26123

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Glennville Sewer Improvements for Zone 3 (PE26123” is a tender record in Taiyo, linked to the Road sector. It is issued for works, goods, or services related to Georgia, United States.

Participants

Not available for this record.

Status

Original status

under evaluation

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Sealed bids for construction of Glennville Sewer Improvements Project (Zone 3) will be received until April 1st, 2026 at 2:00 PM at the City of Glennville City Hall at 134 S. Veterans Blvd, Glennville, GA 30427 at which time and place they will be publicly opened and read. Any bid received after said time and date will not be considered by the Owner. No bid may be withdrawn after the closing time for the receipt of bids for a period of sixty (60) days. The work shall consist of furnishing all products and equipment and performing all labor necessary to perform the following: Sanitary sewerage system rehabilitation including, but not limited to, 6,330 LF of 8¿ CIPP lining and 668 LF of 4¿ CIPP lining. The project will consist of cleaning, pre-tv, post-tv, manhole rehabilitation, removing and replacing asphalt, traffic control, and temporary/permanent grassing. Time allotted for completion of work is one hundred twenty (120) calendar days. Plans, Specifications and Contract Documents are on file at Parker Engineering, LLC. Copies may be obtained from Parker Engineering, LLC., 36 Courtland Street, Suite B, Statesboro, Georgia 30458, Phone: (912) 764-7722, email: lindsey@parker-engineering.com, upon payment of $150.00 for each full-size set (non-refundable). The Scope of Work as described herein is defined as ¿utility contracting¿ in accordance with O.C.G.A 43-14-2(17) so the Contractor performing the work must provide proof of a valid license by the State of Georgia as a ¿Utility Contractor¿ and must also employ a ¿Utility Manager¿ certification holder who will have oversight of all the work. See Instruction to Bidders for additional bidding requirements. Bids shall be accompanied by a bid bond or certified cashier¿s check in an amount not less than 10% of the base bid. Funding is to be provided by American Rescue Plan Act (ARPA) and the City of Glennville. Owner reserves the right to reject any or all Bids and to waive informalities.

Original sector

Construction / Public Works

Location

Country

United States of America (USA)

State

Georgia

Source

Source

Georgia Procurement Registry

URL

More Details

Record type

Tender

Sector

Road, Power Transmission, Power Generation (CCGT), Government, Waste Processing and Treatment

Article published date

2026-10-22

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender