logo

Gmf Hapgood Pond Dam Spillway Bridge Support

Solicitation · Vermont

Source: SAM.gov

Tender
Solicitation

------------------------------------------------------------------------------- Q&A Memorandum: Uploaded 27 August 2026 ------------------------------------------------------------------------------- Solicitation number 12445526Q0126 is issued as a Request for Quotation (RFQ) for GMF Hapgood Pond Dam Spillway Bridge Support. PROJECT SUMMARY: This project is for construction services to repair Hapg

Status
Prospective
Sector
Raw Materials, Bridge, Steel, Hydro, Residential, Cement, Commercial, Road
Location
Manchester Center, Vermont, United States of America
Updated
3 Nov 2026
Source
SAM.gov

ConstructChat

Ask ConstructChat about Gmf Hapgood Pond Dam Spillway Bridge Support

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Gmf Hapgood Pond Dam Spillway Bridge Support” is a tender record in Taiyo, linked to the Raw Materials sector. It is issued for works, goods, or services related to Manchester Center, Vermont, United States of America.

Participants

Not available for this record.

Status

Original status

solicitation

Taiyo status

Prospective

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

------------------------------------------------------------------------------- Q&A Memorandum: Uploaded 27 August 2026 ------------------------------------------------------------------------------- Solicitation number 12445526Q0126 is issued as a Request for Quotation (RFQ) for GMF Hapgood Pond Dam Spillway Bridge Support. PROJECT SUMMARY: This project is for construction services to repair Hapgood Pond Dam bridge supports, on the Green Mountain National Forest. Work includes but is not limited to cleaning and preparing the existing concrete and wingwall surface; drilling and grouting rebar into existing concrete; placing rebar and forms; and placing new concrete bridge supports. SET-ASIDE: This solicitation is set aside 100% for Small Business entities under 237310 - Highway, Street, and Bridge Construction (Size Standard: $45M). PROJECT LOCATION: Hapgood Pond Dam, Green Mountain National Forest. See solicitation and its attachments for additional location details. PROJECT MAGNITUDE: Under $25,000 SOLICITATION POINT OF CONTACT: Matthew (Matt) Killian, Contracting Officer; matthew.killian@usda.gov PLEASE REVIEW ALL SOLICITATION MATERIALS IN-FULL, INCLUDING ALL INSTRUCTIONS TO OFFERORS, PRIOR TO SUBMITTING A QUOTATION. LATE QUOTATIONS AND/OR QUOTATIONS THAT DO NOT COMPLY WITH SAID INSTRUCTIONS MAY BE DETERMINED NON-REPONSIVE AND ELIMINATED FROM AWARD CONSIDERATION.

Original sector

Construction

Location

Country

United States of America (USA)

State

Vermont

City

Manchester Center

Source

Source

SAM.gov

URL

More Details

Record type

Tender

Sector

Raw Materials, Bridge, Steel, Hydro, Residential, Cement, Commercial, Road

Article published date

2026-08-28

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender