Government Owned Pre-Engineered Steel Building Erection
Sector: Aerospace & Defense • Location: Granger Lake Office, 3100 Granger Dam Road, Granger, TX 76530-5067
Source: SAM.gov
SUBJECT: GOVERNMENT OWNED, PRE-ENGINEERED STEEL BUILDING ERECTION, GRANGER LAKE, TEXAS. SOLICITATION NUMBER: W9126G26QA113; SOLICITATION CLOSING DATE: 14 SEPTEMBER 2026. OFFERS DUE BY 10:00 AM CST. ---------- DESCRIPTION: The contractor shall furnish all tools, equipment, labor, and supervision to erect a Government furnished pre-engineered steel building as shown in Statement of Work (SOW) Attach
- Status
- Prospective
- Sector
- Aerospace & Defense, Hydro, Metal, Steel, Cement, Government, Residential, Commercial, Road
- Location
- United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Government Owned Pre-Engineered Steel Building Erection
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | solicitation |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | SUBJECT: GOVERNMENT OWNED, PRE-ENGINEERED STEEL BUILDING ERECTION, GRANGER LAKE, TEXAS. SOLICITATION NUMBER: W9126G26QA113; SOLICITATION CLOSING DATE: 14 SEPTEMBER 2026. OFFERS DUE BY 10:00 AM CST. ---------- DESCRIPTION: The contractor shall furnish all tools, equipment, labor, and supervision to erect a Government furnished pre-engineered steel building as shown in Statement of Work (SOW) Attachment 2 and in accordance with SOW Section 13 34 19 METAL BUILDING SYSTEMS. Materials required for the complete erection of the pre-engineered steel building not listed in SOW Attachment 1 shall be furnished by the Contractor and submitted to the COR for approval. Prior to erection, Contractor shall examine the concrete foundation and masonry bearing surfaces, anchor bolt size and placement, survey slab elevation, locations of bearing plates, and other embedments to receive structural framing with the metal building manufacturers templates and drawings as detailed in the SOW before erecting any steel components for compliance with requirements for installation tolerances and other conditions affecting performance of the Work. Erect metal building system according to manufacturers written erection instructions, approved shop drawings and other erection documents in accordance with MBMA MBSM - Metal Building Systems Manual. Contractor shall perform all work in accordance with the SOW and the terms of the contract. |
Original sector | Construction |
Location
Country | United States of America (USA) |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Aerospace & Defense, Hydro, Metal, Steel, Cement, Government, Residential, Commercial, Road |
Article published date | 2026-08-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
