logo

Government Owned Pre-Engineered Steel Building Erection

The scope, dates and status of this tender. A free account opens every field.

Source: SAM.gov

Tender
Presolicitation

SUBJECT: GOVERNMENT OWNED, PRE-ENGINEERED STEEL BUILDING ERECTION, GRANGER LAKE, TEXAS. PROPOSED SOLICITATION NUMBER: W9126G26QA113; POSTED ON OR ABOUT 20 AUGUST 2026. SOLICITATION CLOSING DATE: 10 SEPTEMBER 2026. DESCRIPTION: The contractor shall furnish all tools, equipment, labor, and supervision to erect a Government furnished pre-engineered steel building as shown in Statement of Work (SOW) A

Status
Prospective
Sector
Residential, Hydro, Cement, Steel, Metal, Aerospace & Defense, Government, Manufacturing (Industrial), Commercial, Road
Location
United States of America
Updated
3 Nov 2026
Source
SAM.gov

ConstructChat

Ask ConstructChat about Government Owned Pre-Engineered Steel Building Erection

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Government Owned Pre-Engineered Steel Building Erection” is a tender record in Taiyo, linked to the Residential sector. It is issued for works, goods, or services related to Granger Lake Office, 3100 Granger Dam Road, Granger, TX 76530-5067.

Participants

Not available for this record.

Status

Original status

presolicitation

Taiyo status

Prospective

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

SUBJECT: GOVERNMENT OWNED, PRE-ENGINEERED STEEL BUILDING ERECTION, GRANGER LAKE, TEXAS. PROPOSED SOLICITATION NUMBER: W9126G26QA113; POSTED ON OR ABOUT 20 AUGUST 2026. SOLICITATION CLOSING DATE: 10 SEPTEMBER 2026. DESCRIPTION: The contractor shall furnish all tools, equipment, labor, and supervision to erect a Government furnished pre-engineered steel building as shown in Statement of Work (SOW) Attachment 2 and in accordance with SOW Section 13 34 19 METAL BUILDING SYSTEMS. Materials required for the complete erection of the pre-engineered steel building not listed in SOW Attachment 1 shall be furnished by the Contractor and submitted to the COR for approval. Prior to erection, Contractor shall examine the concrete foundation and masonry bearing surfaces, anchor bolt size and placement, survey slab elevation, locations of bearing plates, and other embedments to receive structural framing with the metal building manufacturers templates and drawings as detailed in the SOW before erecting any steel components for compliance with requirements for installation tolerances and other conditions affecting performance of the Work. Erect metal building system according to manufacturers written erection instructions, approved shop drawings and other erection documents in accordance with MBMA MBSM - Metal Building Systems Manual. Contractor shall perform all work in accordance with the SOW and the terms of the contract.

Original sector

Not Identified

Location

Country

United States of America (USA)

Source

Source

SAM.gov

URL

More Details

Record type

Tender

Sector

Residential, Hydro, Cement, Steel, Metal, Aerospace & Defense, Government, Manufacturing (Industrial), Commercial, Road

Article published date

2026-08-14

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender