Grand Canyon State Logo Signs Program ; Fabrication Services
Closed · Arizona · Last reported Feb 2026
Source: Arizona Purchasing Group
Statement of Need 1 . 1 . Pursuant to the Arizona Procurement Code , A . R . S . § 41 - 2501 et seq ., the State of Arizona Department of Transportation ( Department ), has a requirement for a term contract for the fabrication and supply of specific service sign logo structure panels and logo panels for the Grand
- Status
- Closed
- Sector
- Road, Bridge, Metal, Steel, Manufacturing (Industrial)
- Location
- Arizona, United States of America
- Updated
- 3 Nov 2026
- Source
- Arizona Purchasing Group
ConstructChat
Ask ConstructChat about Grand Canyon State Logo Signs Program ; Fabrication Services
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Statement of Need 1 . 1 . Pursuant to the Arizona Procurement Code , A . R . S . § 41 - 2501 et seq ., the State of Arizona Department of Transportation ( Department ), has a requirement for a term contract for the fabrication and supply of specific service sign logo structure panels and logo panels for the Grand Canyon State Logo Sign Program . 1 . 2 . The Grand Canyon State Logo Sign Program includes specific service logo signs , AZ 511 sponsor signs , logo panels and / or any sign activity requested by the Department for any sign sponsorship program predominately located on ADOT Roadways throughout the State of Arizona in accordance with the contract requirements herein . 3 . 2 . The Contractor shall adhere to all rules and regulations for all cities , municipalities , counties , state , federal agencies and / or tribal lands as applicable per order . 3 . 3 . All items supplied will be suitable for long term permanent signing applications . 3 . 4 . The Contractor shall have experience and knowledge in making traffic signs that conform to the applicable requirements that have been established by the Federal Highway Administration ( FHWA ) through the Manual on Uniform Traffic Control Devices ( MUTCD ), Standard Highway Signs ( SHS ) and other applicable regulations , rules and standards of practice used to format and make traffic signs . The company should be familiar with the Department ’ s Manual of Approved Signs ( MOAS ), PGP Manual , Signing Standard Drawings and Standard Specifications for Road and Bridge Construction . All signs made shall be made of retro - reflective sheeting that is manufactured and tested in accordance to American Society of Testing Materials ( ASTM ) Designation : D 4956 Standard Specification for Retroreflective Sheeting ; for Traffic Control ( ASTM D 4956 ). 3 . 5 . Work Orders 3 . 5 . 1 . The Contractor shall be responsible for developing and coordinating a sign design drawing procedure corresponding with the ADOT ’ s sign design drawing requirements that is to be used to present a complete layout of the sign that has been ordered . Sign design drawing requirements are specified in the Specifications , Section 4 . 3 . Details on the sign layout work order and sign design form should include as applicable : 3 . 5 . 1 . 1 . MUTCD / Standard Highway Signs ( SHS ) Sign Code and / or MOAS Sign Code ; 3 . 5 . 1 . 2 . Dimensions , text , font style and font spacing 3 . 5 . 1 . 3 . Symbol details ( including graphic grid which can either be referenced or attached if it is special or not readily available ) 3 . 5 . 1 . 4 . Border width , border radius , border location 3 . 5 . 1 . 5 . Colors , shape , brand name materials to be used for background 3 . 5 . 1 . 6 . Text , symbols border and plaques , substrate type , substrate thickness 3 . 5 . 1 . 7 . Supplying stringers and all other miscellaneous details on the sign proposed to be made . 3 . 5 . 2 . Submittal drawings are required for each work order . The Contractor shall make sure the Department has the opportunity to review , comment , make changes and sign - off on the final configuration of the sign order before they are fabricated . No signs will be made without written approval for the submittal drawing . 3 . 5 . 3 . Contractor shall not order materials or commence work without an approved work order and purchase order . 4 . Specific Requirements 4 . 1 . Supply Item Categories and Requirements To define specific technical requirements and scope classifications , the supply items have been grouped into categories by basic sign type . The following categories provide general descriptions and applicable requirements for each group . 4 . 1 . 1 . Category A – MUTCD / SHS / MOAS Specific Service Signs 4 . 1 . 1 . 1 . The signs shall come on extruded or a continuous single sheet of aluminum per the thickness specified with rounded or radius corners as specified in the MOAS and the MUTCD or as otherwise directed on the work order . All retroreflective backgrounds , lettering , borders , markings , and symbols per sign order shall include all labor , equipment , materials , bracings , packaging and all other incidentals required to effectively complete the work specified . |
Location
Country | United States of America (USA) |
State | Arizona |
Source
Source | Arizona Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Road, Bridge, Metal, Steel, Manufacturing (Industrial) |
Article published date | 2026-03-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Road tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- NEW TIRES RETREADS AND TIRE SERVICES
- Professional Construction Engineering and Inspection CEI Services for the Williamson Boulevard Widening
- Lincoln Avenue Wascher to Killarney Preliminary Engineering Section 220065800PV
- KilleenFort Hood Regional Airport KFHRA Terminal Apron Rehabilitation Phase II
- IFB 947902022JM Screening 10 Asphalt Filter Stone 8 Granite Double Washed
- IFB 914202022AM Street Sweeper Parts and Brooms
- IFB 843402021AB Hay Alfalfa and Wheat Straw for Norfolk Zoo
