logo

Greenfield Transfer Station Containment Wall Construction And Pit Filling / Patching

Sector: Metal • Location: Massachusetts, United States of America

Source: Massachusetts Purchasing Group

Tender
Closed

The City of Greenfield (“ Owner ", or " City ”), is soliciting quotes for the construction of a 16 ’- 8 ” x 7 ’ x 12 ” engineered concrete wall anchored on a proposed 16 ’- 8 ” x 12 ” x 3 ’ footing that is to be anchored into the existing 6 ” thick concrete slab within the Greenfield Transfer Station main bu

Status
Closed
Sector
Metal, Commercial, Cement, Road
Location
Massachusetts, United States of America
Updated
3 Nov 2026
Source
Massachusetts Purchasing Group

ConstructChat

Ask ConstructChat about Greenfield Transfer Station Containment Wall Construction And Pit Filling / Patching

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Greenfield Transfer Station Containment Wall Construction And Pit Filling / Patching” is a tender record in Taiyo, linked to the Metal sector. It is issued for works, goods, or services related to Massachusetts, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The City of Greenfield (“ Owner ", or " City ”), is soliciting quotes for the construction of a 16 ’- 8 ” x 7 ’ x 12 ” engineered concrete wall anchored on a proposed 16 ’- 8 ” x 12 ” x 3 ’ footing that is to be anchored into the existing 6 ” thick concrete slab within the Greenfield Transfer Station main building . The proposed concrete wall runs north / south 37 ’- 2 ” from inside of the west wall and to be also anchored into the existing southern concrete wall of the Greenfield Transfer Station located at 86 Cumberland Road , Greenfield , MA . Also , to have an existing 10 ’- 8 ” x 12 ’- 7 ” x 5 ’ conveyor pit filled / patched with concrete to a depth of 6 ”. This new pour should be anchored to the existing slab . The conveyor pit is currently filled with gravel . The conveyor pit is lined with sheet metal and the Greenfield DPW will remove the metal before construction required in this contract is performed . The proposal shall be all inclusive , including preparing the project area for construction , constructing the proposed concrete wall , fill / patch the conveyor pit , post construction cleaning of the construction site , and removal of unused materials . The proposed engineered concrete wall is to be located inside the building on the east side of the recycling containment area which is in the southwest corner of the building . The Greenfield Transfer Station is located at 86 Cumberland Road , Greenfield , MA 01301 .

Location

Country

United States of America (USA)

State

Massachusetts

Source

Source

Massachusetts Purchasing Group

URL

More Details

Record type

Tender

Sector

Metal, Commercial, Cement, Road

Article published date

2026-05-02

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender