logo

Gsu Transformer Supply, Oahe Dam, Sd & Ft Peck Dam, Mt

The scope, dates and status of this tender. A free account opens every field.

Source: SAM.gov

Tender
Award Notice

Project Description: Ft Peck Supply of the generator step-up (GSU) transformers 4 and 5 located in switchyard #2 at the Fort Peck Dam. The final suppy contract for the Fort Peck transformers will include: * Design and manufacturing of two new GSU transformers. * Design and manufacturing of ancillary and control components. * Performance of Factory Acceptance Testing (FAT). * Delivery to the Fort P

Status
Closed
Sector
Aerospace & Defense, Hydro, Power Generation (CCGT), Manufacturing (Industrial), Oil and Gas, Commercial, Residential
Location
Fort Pierre, South Dakota, United States of America
Updated
3 Nov 2026
Source
SAM.gov

ConstructChat

Ask ConstructChat about Gsu Transformer Supply, Oahe Dam, Sd & Ft Peck Dam, Mt

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

4 Q
The tender “Gsu Transformer Supply, Oahe Dam, Sd & Ft Peck Dam, Mt” is a tender record in Taiyo, linked to the Aerospace & Defense sector. It is issued for works, goods, or services related to Fort Pierre, South Dakota, United States of America.

Participants

Not available for this record.

Status

Original status

award notice

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Project Description: Ft Peck Supply of the generator step-up (GSU) transformers 4 and 5 located in switchyard #2 at the Fort Peck Dam. The final suppy contract for the Fort Peck transformers will include: * Design and manufacturing of two new GSU transformers. * Design and manufacturing of ancillary and control components. * Performance of Factory Acceptance Testing (FAT). * Delivery to the Fort Peck power plant, offloading at the transformer temporary storage and staging location, transformer reassembly, oil processing and filling, and movement to final operating location as the location is made available by the separate installation contractor. * Final acceptance testing and commissioning of transformer after interconnection to the power plant is performed by the separate installation contractor. Oahe Supply of all GSU transformers locatd at Oahe Dam. The supply contract for the Oahe transformers will include: * Design and manufacturing of 10 new GSU transformers. * Design and manufacturing of ancillary and control components. * Performance of Factory Acceptance Testing (FAT). * Delivery to the Oahe Dam power plant, offloading at the transformer temporary storage and staging location, transformer reassembly, oil processing and filling, and movement to final operating location as the location is made available by the separate installation contractor. *Final acceptance testing and commissioning of transformer after interconnection to the power plant is performed by the separate installation contractor.

Original sector

Not Identified

Budget

Location

Country

United States of America (USA)

State

South Dakota

City

Fort Pierre

Source

Source

SAM.gov

URL

More Details

Record type

Tender

Sector

Aerospace & Defense, Hydro, Power Generation (CCGT), Manufacturing (Industrial), Oil and Gas, Commercial, Residential

Article published date

2026-02-21

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender