Haddad Floating Dock Decking Replacement
The scope, dates and status of this tender. A free account opens every field.
Source: West Virginia Purchasing Group
This project involves removing existing Trex composite decking and southern yellow pine nailers from the steel truss frame docking system , properly disposing of removed materials , and installing new composite decking and composite nailer boards that meet or exceed the specifications detailed herein . 3 . 1 REMOVAL
- Status
- Closed
- Sector
- Steel, Rail
- Location
- West Virginia, United States of America
- Updated
- 3 Nov 2026
- Source
- West Virginia Purchasing Group
ConstructChat
Ask ConstructChat about Haddad Floating Dock Decking Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | This project involves removing existing Trex composite decking and southern yellow pine nailers from the steel truss frame docking system , properly disposing of removed materials , and installing new composite decking and composite nailer boards that meet or exceed the specifications detailed herein . 3 . 1 REMOVAL AND REPLACEMENT OF DECKING AND NAILER BOARDS 3 . 1 . 1 REMOVAL AND DISPOSAL : • Remove existing Trex composite decking from the floating dock steel truss frame system • Remove existing southern yellow pine nailer boards from the dock frame • Properly dispose of all removed materials in accordance with applicable local , state , and federal regulations • Remove and set aside ( for re - use ) the deck rail on the bank side of the dock and on both sides of the end gangway landing 3 . 1 . 2 SURFACE PREPARATION : • Prepare dock frame surface by removing all prior decking materials including screws , bolts , and fasteners • Ensure frame surface is clean , level , and free of debris in preparation for new decking installation • Inspect steel truss frame for damage and report any structural concerns to the City prior to installation 3 . 1 . 3 MATERIAL INSTALLATION : • Install new composite decking boards and nailer boards meeting the specifications in Section 5 • Install decking and nailers to match the height of existing bump board on the sides of the docks • Secure decking with approved fasteners per manufacturer specifications • Re - install deck rail on bank side and end gangway landing following decking installation 3 . 1 . 4 PROJECT COMPLETION : • Inspect all work for quality and compliance with specifications • Remove all construction debris and equipment from site • Provide final walk - through with City representatives |
Location
Country | United States of America (USA) |
State | West Virginia |
Source
Source | West Virginia Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Steel, Rail |
Article published date | 2026-05-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Steel tenders in United States of America
- Construction Materials Testing and Inspection Services for Thousand Oaks Boulevard Pedestrian Crossing CI 5398
- Street Construction Materials
- Jail Courthouse Walkway Project
- RFP 887702021MF Rapid Response Fire Boat for Norfolk FireRescue
- Millbrae Warehouse Loading Dock Repair
- Biosolids Digester Facilities - Southeast Treatment Plant T-...
- Marin Street Sewer Replacement - BID TABULATION
- Southeast Water Pollution Control Plant HVAC and Mechanical ...
