logo

Halfmoon Lake Watershed - Based Management Plan Implementation – Phase 1

Location: New Hampshire, United States of America

Source: New Hampshire Purchasing Group

Tender
Closed

1 . Develop a Site Specific Project Plan ( SSPP ) that will include all aspects of data collection and modeling for each of the above - referenced three ( 3 ) site locations as identified in the HMLA WBMP . This will include , but not be limited to , watershed Best Management Practice ( BMP ) phosphorus load redu

Status
Closed
Location
New Hampshire, United States of America
Updated
3 Nov 2026
Source
New Hampshire Purchasing Group

ConstructChat

Ask ConstructChat about Halfmoon Lake Watershed - Based Management Plan Implementation – Phase 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Halfmoon Lake Watershed - Based Management Plan Implementation – Phase 1” is a tender record in Taiyo. It is issued for works, goods, or services related to New Hampshire, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

1 . Develop a Site Specific Project Plan ( SSPP ) that will include all aspects of data collection and modeling for each of the above - referenced three ( 3 ) site locations as identified in the HMLA WBMP . This will include , but not be limited to , watershed Best Management Practice ( BMP ) phosphorus load reduction modeling . 2 . Develop conceptual BMP designs , estimated cost of materials , and implementation costs for each of the three ( 3 ) sites . These conceptual designs will be reviewed with NHDES Watershed Assistance Section ( WAS ), landowners , HMLA , and NHDES for comment . After review , address comments to prepare the final BMP designs to be issued to landowners , HMLA , NHDES , and WAS . 3 . Meet all procedural requirements to provide the legal authority to implement BMPs on each of the three ( 3 ) sites . Obtain all necessary town , state , and federal permits for the Site . Prepare Operation and Maintenance ( O & M ) plans with landowners for the site to ensure longterm success of implemented BMP designs . 4 . Provide assistance with developing construction bid documents , and then supervise construction of the designed and permitted BMPs to mitigate stormwater runoff from each of the three ( 3 ) sites into Halfmoon Lake . 5 . Develop final measurements to calculate pollutant reductions . Prepare Non - Point Source ( NPS ) pollution site reports and Pollutants Controlled Reports ( PCRs ) for the Site . 6 . Prepare conceptual stormwater BMP designs , estimated cost of materials , and implementation costs to mitigate stormwater runoff at several additional BMP sites as selected by HMLA . Calculate pollution load reductions on these sites after BMP implementation by HMLA , private contractors , and / or community volunteers .

Location

Country

United States of America (USA)

State

New Hampshire

Source

Source

New Hampshire Purchasing Group

URL

More Details

Record type

Tender

Article published date

2026-04-28

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender