Hand Village Heat Pump Replacement ( 32 )
Sector: Education • Location: Tennessee, United States of America
Source: Tennessee Purchasing Group
Austin Peay State University is seeking a firm price quotation for the replacement of 32 heat pump units for Hand Village . Scope of Work : 1 . Remove existing unit from specified apt and dispose of properly off site . 2 . Install new outdoor heat pump 2 . 5 - 3 - t o n 14 . 3 seer 2 for Hand Village
- Status
- Closed
- Sector
- Education, Commercial
- Location
- Tennessee, United States of America
- Updated
- 3 Nov 2026
- Source
- Tennessee Purchasing Group
ConstructChat
Ask ConstructChat about Hand Village Heat Pump Replacement ( 32 )
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Austin Peay State University is seeking a firm price quotation for the replacement of 32 heat pump units for Hand Village . Scope of Work : 1 . Remove existing unit from specified apt and dispose of properly off site . 2 . Install new outdoor heat pump 2 . 5 - 3 - t o n 14 . 3 seer 2 for Hand Village . Units must have a 5 - year parts warranty and 1 year labor warranty . Contractor to register all units for additional 5 - year parts warranty . Provide APSU with paperwork at end of job . 3 . Unit must have R32 refrigerant . 454B will not be accepted . 4 . Install new indoor air handler with 8 kw heat kit . Unit must have access to filter replacement on front of unit . ( side facing access door ) 5 . Unit must have a slant evaporator coil . 6 . Replace thermostat in unit with a Honeywell Nl00 . On / off , heat / cool / fan and temp setting . Prefer one that can be set with designated set points . 7 . Flush all line sets and leak check . Re use lines . 8 . Replace electrical whip for unit . 9 . Brase and pressure test line sets to compressor and air handler . 10 . Linesets shall be reinsulated if any insulation is missing . 10 . Check for proper breakers and fuses . Label all disconnects and what apt they service . 11 . No pro press of quick connect fittings will be allowed . 12 . Drain shall have a S52 safety switch installed . 13 . Confirm proper size of wiring for units . Replace it if needed . 14 . Test and run system in both heat and cooling modes . 15 . Contractor responsible for any damage to roofs , drywall , floors etc . Please notify APSU if any damage is present before work starts . 16 . Contractor to supply all lift equipment / cranes as needed . 17 . All ducts must be cleaned / sanitized at end of job . Units to be replaced : Building 1 Units 1 , 2 , 3 , 5 , 8 and 9 ; Building 2 Unit 2 ; Building 3 Units 2 , 4 , 7 , 9 , 11 ; Building 4 Units 2 , 3 , 4 , 8 , 9 . Building 5 Units 3 , 6 , 9 , 11 - Building 6 Units 2 , 4 , 11 , 12 , 13 - Building 7 Units 2 , 5 , 6 , 9 - Building 8 Units 2 and 9 . 32 UNITS |
Location
Country | United States of America (USA) |
State | Tennessee |
Source
Source | Tennessee Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Education, Commercial |
Article published date | 2026-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
