Hannibal MACC Detention Basin Restoration Project
Closed · Missouri · Last reported Apr 2026
Source: Missouri Purchasing Group
Project Overview Moberly Area Community College is seeking bids from qualified contractors to restore an existing detention basin to its original functional condition while improving long - term erosion resistance . The project includes grading , erosion repair , reinforced materials , concrete repairs , and site restoratio
- Status
- Closed
- Sector
- Power Transmission, Power Generation (CCGT), Cement
- Location
- Missouri, United States of America
- Updated
- 3 Nov 2026
- Source
- Missouri Purchasing Group
ConstructChat
Ask ConstructChat about Hannibal MACC Detention Basin Restoration Project
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Project Overview Moberly Area Community College is seeking bids from qualified contractors to restore an existing detention basin to its original functional condition while improving long - term erosion resistance . The project includes grading , erosion repair , reinforced materials , concrete repairs , and site restoration . Scope of Work The contractor shall provide all labor , materials , equipment , tools , supervision , and incidentals required to complete the following work : - Remove and dispose of existing rock and landscape edging within the detention basin . - Reinstall the flared end section disconnected from the north storm pipe outlet and ensure proper alignment and stabilization . - Regrade the bottom of the detention basin to original plan grade to restore proper drainage . - Supply and install approved separation geotextile fabric on prepared soil subgrade . - Supply and install white limestone riprap over fabric . Riprap shall be larger and more durable than existing material and suitable for stormwater flow conditions . - Form and pour flowable fill concrete beneath the south spillway to repair erosion under the existing concrete slab . - Backfill and compact fill material along the east side of the spillway . - Form and pour approximately 10 linear feet of concrete curb on top of the east side of the spillway slab to improve erosion control . - Add topsoil to the west slope to repair lawn mower rutting and fine grade for turf . - Seed , straw , and fertilize all disturbed areas affected by construction activities . Contractor Responsibilities - Provide all equipment , including excavation and safety measures such as utility locates . - Maintain safe work zones and protect adjacent roadways and campus property . - Restore all areas not specifically designated as part of the final construction . |
Location
Country | United States of America (USA) |
State | Missouri |
Source
Source | Missouri Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Power Transmission, Power Generation (CCGT), Cement |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Power Transmission tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Security Hardware Services
- Se Dixie Highway County Road A1A Utility Relocation Project
- PreQualification of Bidders for Chaboya Improvements
- Utility Management System and Services UMSS
- FY2023 Patch Truck
- Desert Willow Perimeter Landscape and Lighting Rehabilitation Phase 2 Project
