Hartland High School Pool Stairs Renovation
Closed · MITN · Last reported Feb 2026
Source: MITN Purchasing Group
Hartland Consolidated Schools is seeking bids for the renovation of the pool slide stairs at Hartland High School . General Scope of Work Existing Conditions and General Responsibility – Paint and Structural Steel Scope • Contractor shall assume full responsibility for all existing conditions , whether visible or
- Status
- Closed
- Sector
- Metal, Steel
- Location
- MITN, United States of America
- Updated
- 3 Nov 2026
- Source
- MITN Purchasing Group
ConstructChat
Ask ConstructChat about Hartland High School Pool Stairs Renovation
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Hartland Consolidated Schools is seeking bids for the renovation of the pool slide stairs at Hartland High School . General Scope of Work Existing Conditions and General Responsibility – Paint and Structural Steel Scope • Contractor shall assume full responsibility for all existing conditions , whether visible or concealed , that affect completion of the Work . • The Base Scope includes all labor , materials , equipment , supervision , coordination , safety measures , and incidentals required to deliver a complete , functional , and code - compliant pool stair system . • Bidder understands multiple mobilizations may be required for this work and has included costs for multiple mobilization • Contractor shall comply with all applicable Occupational Safety and Health Administration ( OSHA ) regulations , including 29 CFR Part 1926 – Safety and Health Regulations for Construction , and all applicable federal , state , and local safety requirements . • Contractor shall be solely responsible for the safety of its employees , subcontractors , and visitors , and for maintaining a safe work environment at all times . 2 . Handrails and Guardrails – Structural Steel Scope • Remove , temporarily support , modify as necessary , and reinstall all existing handrails , guardrails , posts , brackets , and attachments impacted by the Work . • Handrails shall be returned to service in a safe , secure , and code - compliant condition , including all repairs , alignment , tightening , welding , grinding , or replacement of damaged components . • All modifications required to satisfy inspection or Authority Having Jurisdiction ( AHJ ) approval are included . 3 . Painting and Coatings – Paint Scope • Provide complete surface preparation and coating of all exposed stair components , including but not limited to : o Stair treads ( top and underside ) o Stringers o Railings and posts o Support columns and arms o Metal landings and associated framing • Surface preparation shall include descaling , grinding , cleaning , and patching as required to meet coating manufacturer requirements . • Apply epoxy or high - performance protective coating systems suitable for a natatorium environment . • Include all materials , labor , ventilation , odor mitigation , masking , containment , protection of adjacent areas , and curing requirements . • Include a $ 5 , 000 . 00 general allowance . |
Location
Country | United States of America (USA) |
State | MITN |
Source
Source | MITN Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Metal, Steel |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
