logo

Hartland High School Pool Stairs Renovation

Closed · MITN · Last reported Feb 2026

Source: MITN Purchasing Group

Tender
Closed

Hartland Consolidated Schools is seeking bids for the renovation of the pool slide stairs at Hartland High School . General Scope of Work Existing Conditions and General Responsibility – Paint and Structural Steel Scope • Contractor shall assume full responsibility for all existing conditions , whether visible or

Status
Closed
Sector
Metal, Steel
Location
MITN, United States of America
Updated
3 Nov 2026
Source
MITN Purchasing Group

ConstructChat

Ask ConstructChat about Hartland High School Pool Stairs Renovation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Hartland High School Pool Stairs Renovation” is a tender record in Taiyo, linked to the Metal sector. It is issued for works, goods, or services related to MITN, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Hartland Consolidated Schools is seeking bids for the renovation of the pool slide stairs at Hartland High School . General Scope of Work Existing Conditions and General Responsibility – Paint and Structural Steel Scope • Contractor shall assume full responsibility for all existing conditions , whether visible or concealed , that affect completion of the Work . • The Base Scope includes all labor , materials , equipment , supervision , coordination , safety measures , and incidentals required to deliver a complete , functional , and code - compliant pool stair system . • Bidder understands multiple mobilizations may be required for this work and has included costs for multiple mobilization • Contractor shall comply with all applicable Occupational Safety and Health Administration ( OSHA ) regulations , including 29 CFR Part 1926 – Safety and Health Regulations for Construction , and all applicable federal , state , and local safety requirements . • Contractor shall be solely responsible for the safety of its employees , subcontractors , and visitors , and for maintaining a safe work environment at all times . 2 . Handrails and Guardrails – Structural Steel Scope • Remove , temporarily support , modify as necessary , and reinstall all existing handrails , guardrails , posts , brackets , and attachments impacted by the Work . • Handrails shall be returned to service in a safe , secure , and code - compliant condition , including all repairs , alignment , tightening , welding , grinding , or replacement of damaged components . • All modifications required to satisfy inspection or Authority Having Jurisdiction ( AHJ ) approval are included . 3 . Painting and Coatings – Paint Scope • Provide complete surface preparation and coating of all exposed stair components , including but not limited to : o Stair treads ( top and underside ) o Stringers o Railings and posts o Support columns and arms o Metal landings and associated framing • Surface preparation shall include descaling , grinding , cleaning , and patching as required to meet coating manufacturer requirements . • Apply epoxy or high - performance protective coating systems suitable for a natatorium environment . • Include all materials , labor , ventilation , odor mitigation , masking , containment , protection of adjacent areas , and curing requirements . • Include a $ 5 , 000 . 00 general allowance .

Location

Country

United States of America (USA)

State

MITN

Source

Source

MITN Purchasing Group

URL

More Details

Record type

Tender

Sector

Metal, Steel

Article published date

2026-04-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender