Hartshorn Marina Dredging
One of 3,321 tenders Taiyo tracks in MITN.
Source: MITN Purchasing Group
The City of Muskegon needs the marina dredging to proper depths to allow for larger boats . • A pre - dredge survey will be required and approved before any work starts . • A post dredge survey will be required . The difference between these two surveys will be the quantity paid . • Over dredging will be
- Status
- Closed
- Sector
- Seaport
- Location
- MITN, United States of America
- Updated
- 3 Nov 2026
- Source
- MITN Purchasing Group
ConstructChat
Ask ConstructChat about Hartshorn Marina Dredging
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The City of Muskegon needs the marina dredging to proper depths to allow for larger boats . • A pre - dredge survey will be required and approved before any work starts . • A post dredge survey will be required . The difference between these two surveys will be the quantity paid . • Over dredging will be allowed but not paid for . Quantity dredged will not exceed 7500 cubic yards . • Sieve analysis report of the debris is included with this bid package and is provided for information purposes only . No guarantee implied . Contractor to verify debris . |
Location
Country | United States of America (USA) |
State | MITN |
Source
Source | MITN Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Seaport |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Seaport tenders in United States of America
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Coir Log Furnish InstallRobinwood
- Recreation Supplies Parks Recreation
- Bay Corridor Transmission and Distribution - Phase 3 (2019) ...
- Transmission Line 7/8 Upgrades [BID TABULATION]
- Moccasin Penstock Rehabilitation - BID TABULATION
- New Treasure Island Wastewater Treatment Plant
- San Andreas Reservoir Road Improvements [BID TABULATION]
