Hayling College - Boiler Upgrade
Complete · United Kingdom
Source: Open Contracting Data Standard (OCDS)
Remove the existing boiler plant and replace with a new natural gas fired condensing boiler installation. Remove existing flue systems and install new flue systems to serve the new gas fired equipment. Connect the new gas fired equipment to the existing heating circuits, Gas Supply pipework, Electrical power. Redundant boilers, gas and electrical components, pipework and cable will be removed from
- Status
- Closed
- Sector
- Natural Gas
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Open Contracting Data Standard (OCDS)
ConstructChat
Ask ConstructChat about Hayling College - Boiler Upgrade
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Remove the existing boiler plant and replace with a new natural gas fired condensing boiler installation. Remove existing flue systems and install new flue systems to serve the new gas fired equipment. Connect the new gas fired equipment to the existing heating circuits, Gas Supply pipework, Electrical power. Redundant boilers, gas and electrical components, pipework and cable will be removed from site. |
Location
Country | United Kingdom (UK) |
Source
Source | Open Contracting Data Standard (OCDS) |
URL |
More Details
Record type | Tender |
Sector | Natural Gas |
Article published date | 2026-11-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
