logo

HCTP DIGESTER BACKUP BOILER UPGRADE PROJECT CI 5615

Sector: Cement • Location: Thousand Oaks, California, United States of America

Source: Open Gov Tenders

Tender
Open

The Work to be performed under this Contract shall consist of furnishing all tools, equipment, materials, labor, supplies, and manufactured articles for the Project. It shall also include the furnishing of all transportation and service, including fuel, power, and essential communications, and for the performance of all labor, work, or other operations required for the fulfillment of the Contract

Tender Information FAQ

Tender Information

3 Q
The tender “HCTP DIGESTER BACKUP BOILER UPGRADE PROJECT CI 5615” is a tender record in Taiyo, linked to the Cement sector. It is issued for works, goods, or services related to Thousand Oaks, California, United States of America.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

open

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Work to be performed under this Contract shall consist of furnishing all tools, equipment, materials, labor, supplies, and manufactured articles for the Project. It shall also include the furnishing of all transportation and service, including fuel, power, and essential communications, and for the performance of all labor, work, or other operations required for the fulfillment of the Contract in strict accordance with the Contract Documents. The general scope of work for this project involves removing the existing boiler system, piping, and equipment and installing a new dual fuel (natural and digester gas) backup boiler system for the three existing wastewater digesters at the HCTP. Additionally, the project includes replacing existing insulated and non-insulated piping, installing a temporary skid-mounted boiler system when the existing boiler system is offline during construction, heat exchanger valves, miscellaneous concrete, miscellaneous electrical works, and associated appurtenances as indicated in the Contract Documents.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data