logo

Heat Treatment for Bed Bug Extermination in Building 223 at Camp Gruber Training Site

Sector: Warehouse • Location: Oklahoma, United States of America

Source: Oklahoma Purchasing Group

Tender
Closed

PROJECT SCOPE : Heat treatment for the extermination of bed bugs in building 223 . Removal and disposal of all mattresses that contain rips , holes , or other defects that may be a habitat for bed bugs or bed bug eggs . Cleanup of all bed bug remains and any residual from heat treatment equipment or

Status
Closed
Sector
Warehouse, Residential, Commercial
Location
Oklahoma, United States of America
Updated
3 Nov 2026
Source
Oklahoma Purchasing Group

ConstructChat

Ask ConstructChat about Heat Treatment for Bed Bug Extermination in Building 223 at Camp Gruber Training Site

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Heat Treatment for Bed Bug Extermination in Building 223 at Camp Gruber Training Site” is a tender record in Taiyo, linked to the Warehouse sector. It is issued for works, goods, or services related to Oklahoma, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

PROJECT SCOPE : Heat treatment for the extermination of bed bugs in building 223 . Removal and disposal of all mattresses that contain rips , holes , or other defects that may be a habitat for bed bugs or bed bug eggs . Cleanup of all bed bug remains and any residual from heat treatment equipment or processes . Reposition all furnishing in building ( to exclude removed damaged mattresses ) back to original layout . Heat Treatment : Contractor will ensure the temperature of each room in building 223 ( approximately 20 , 423 SQ FT ) is raised to the appropriate level and held at that temperature for an appropriate amount of time ( per industry standards ) to ensure that all bed bugs and bed bug eggs are exterminated . Building 223 consists of 8 sleeping bays with bunk beds ( double or single ) with mattresses and wall lockers . 1 consolidated kitchen and dining area with tables , chairs , and kitchen equipment . 4 bathrooms . 1 logistics area with supply cage , desk , and chairs . 1 administration area with desks and chairs . And 1 common area consisting of stair well and entry area . Contractor shall provide Camp Gruber with documentation stating the minimum temperature and the amount of time it was held for each room . Mattress Removal : Contractor will be responsible for inspecting approximately 198 mattresses , identifying any with rips , holes , or other defects that may be a habitat for bed bugs or bed bug eggs , and for removal and proper disposal of all mattresses with rips , holes , or other defects . Any mattress not containing defects is to remain in place . Cleanup : Contractor shall clean all areas of the building to remove all bed bug remains . Clean any other residual from heat treatment equipment , personnel in the building , or the processes from bed bug removal . Reposition Furnishings : Contractor shall reposition all furnishings moved during the treatment or cleaning process back to their original locations ( to exclude removed damaged mattresses ). Contractor is not responsible for replacing damaged and removed mattresses .

Location

Country

United States of America (USA)

State

Oklahoma

Source

Source

Oklahoma Purchasing Group

URL

More Details

Record type

Tender

Sector

Warehouse, Residential, Commercial

Article published date

2026-04-08

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender