Heating , Ventilation , and Air Conditioning ( HVAC ) Replacement Services in Calaveras County

The scope, dates and status of this tender. A free account opens every field.

Source: California Purchasing Group

Tender
Closed

A . Pre - Work Meeting 1 ) After receiving the Notice to Proceed ( NTP ), Contractor shall contact Caltrans Contract Manager to schedule a mutually agreed upon date and time for a Pre - Work Meeting , to be held not more than 30 days after Contractor receives the NTP . 2 ) The purpose of the Pre - Work Meeti

Status
Closed
Sector
Water Supply and Storage, Metal, Steel, Manufacturing (Industrial), Power Generation (CCGT)
Location
California, United States of America
Updated
3 Nov 2026
Source
California Purchasing Group

ConstructChat

Ask ConstructChat about Heating , Ventilation , and Air Conditioning ( HVAC ) Replacement Services in Calaveras County

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Heating , Ventilation , and Air Conditioning ( HVAC ) Replacement Services in Calaveras County” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to California, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

A . Pre - Work Meeting 1 ) After receiving the Notice to Proceed ( NTP ), Contractor shall contact Caltrans Contract Manager to schedule a mutually agreed upon date and time for a Pre - Work Meeting , to be held not more than 30 days after Contractor receives the NTP . 2 ) The purpose of the Pre - Work Meeting is to discuss the process steps and schedule of work to be performed , as well as for the Contractor to submit data sheets to Caltrans Contract Manager . 3 ) Contractor shall prepare a submittal for all new units . 4 ) Contractor shall verify all measurements prior to ordering materials . 5 ) Contractor must receive written approval from Caltrans Contract Manager prior to purchasing any parts or materials necessary to complete the contracted work . B . Removal Contractor shall be responsible for the proper legal disposal of all parts removed , including but not limited to the entire existing HVAC air handlers and condensers , including recovered refrigerant . This includes any other litter , waste , debris , and similar materials arising from or produced by the work being performed under this agreement . C . Installation ( Units ) Contractor shall furnish one ( 1 ) new unit for a 8500 BTU area ( 1 room ) of like kind and size with the same cubic feet per minute ( cfm ) output as those units removed . D . Installation Specifics 1 ) Contractor shall relabel all new units and power disconnects for identification purposes . 2 ) Contractor shall replace all PVC with copper pipes , to condensate piping . 3 ) Contractor shall replumb gas shutoffs and sediment traps for correct installation . 4 ) Contractor shall replace old power shutoffs and correct any deficiencies . 5 ) Contractor shall replace all failed conduit with weather tight flexible steel coated conduit . 6 ) Contractor shall perform any necessary roof repair and sealing around units to prevent leaks . 7 ) Contractor shall ensure roof top units are comparable in weight to existing unit ; if a heavier unit is used , Contractor shall conduct a structural analysis to ensure proper support . 8 ) Contractor shall verify that the existing power service meets the needs and requirements of all the new units . Any power supply modifications ( wire size , breaker sizing and conduit sizing ) shall be included , as needed , to meet voltage , phase , and / or amperage differences between units . 9 ) Hood adaptors are allowed for the purpose of installing compatible units . E . Miscellaneous Contractor Responsibilities Contractor shall perform the following tasks : 1 ) Provide materials , fasteners , and complete compatible HVAC units . 2 ) Mounting location ; inspect the mounting locations of all units . Determine if locations meet the manufacturers recommendations for installation . Demolish and replace or retrofit the mounting locations to facilitate the correct installation of the new HVAC units . Ensuring surface is correct for proper operation of HVAC unit with a flat / level mounting surface , providing adequate drainage away from the pads to ensure the proper operation and expected service life of the equipment is achieved . 3 ) Inspect serviceability of existing copper lines and control wiring between inside and outside HVAC components . Replace or clean as needed to ensure years of maintenance free service . Include in the purging and cleaning , or replacement of the existing cooper lines between the condensers and the air handlers , contractor needs to install insulation to assist in efficiency . Installation needs to be to industry standards . 4 ) Relocate / replumb piping , verify / upgrade wiring as needed for correct connection , and verify control wiring serviceability for all new units . 5 ) Relocate condensation drainpipes as needed to ensure correct drainage of water . 6 ) Warranty provided by Contractor is per manufacturer ’ s warranty , or one ( 1 ) year , whichever is longer . Workmanship is of one year except for the roof mounted unit will have a three ( 3 ) year leak free guarantee . That is three ( 3 ) years of no leaking caused by rain or snow . In the event of a leak in the roof caused by installation , Contactor is liable for all repairs at the Contractor ’ s sole expense . 7 ) Contractor shall perform system start - up and instruct site personnel on operation or maintenance of new systems or equipment , as necessary . Contractor shall also include a written - up manufacturing start up commission report to Caltrans Contract Manager at the completion of work . 8 ) Inspect serviceability of existing insulation and copper lines and control wiring between inside and outside HVAC components . Replace or clean as needed to ensure years of maintenance free of service . 9 ) Contractor is responsible for all permits needed . ( This “ like and kind ” replacement will be exempt from State Fire Marshal ( SFM ) permit requirements ).

Location

Country

United States of America (USA)

State

California

Source

Source

California Purchasing Group

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Metal, Steel, Manufacturing (Industrial), Power Generation (CCGT)

Article published date

2026-03-27

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender