Heavy Duty Tire Machine
The scope, dates and status of this tender. A free account opens every field.
Source: Georgia Purchasing Group
No . 1 . Safely able to do tires up to 90 . 5 " 2 . With spindle head that raises wheels into position 3 . Hydraulic powered carriage 4 . Hydraulic powered tool arm 5 . Twin rollers for loosening beads and de mount tires 6 . Wireless controller 7 Standard 3 phase 220 / 230v
- Status
- Closed
- Sector
- Broadband, Telecommunications
- Location
- Georgia, United States of America
- Updated
- 3 Nov 2026
- Source
- Georgia Purchasing Group
ConstructChat
Ask ConstructChat about Heavy Duty Tire Machine
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | No . 1 . Safely able to do tires up to 90 . 5 " 2 . With spindle head that raises wheels into position 3 . Hydraulic powered carriage 4 . Hydraulic powered tool arm 5 . Twin rollers for loosening beads and de mount tires 6 . Wireless controller 7 Standard 3 phase 220 / 230v |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Broadband, Telecommunications |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Broadband tenders in United States of America
- Geary Blvd. Sewer and Water Improvements
- Broadband Partnership
- Construction Manager Risk CMAR East Park P0625
- Web Content Management System Replacement
- Bay Corridor Transmission and Distribution - Phase 3 (2019) ...
- Design-Build Services for San Joaquin Valley Communication S...
- CANCELLED - Alameda Creek Recapture - Barge System Supplier ... Cost:
- 40 Gigabits per Second Collocation Switch Between VTA and Internet Service Provider Internet Point of Presence
