Henderson County Sports Complex Restroom Buildings Project
The scope, dates and status of this tender. A free account opens every field.
Source: North Carolina Purchasing Group
Complete turnkey construction of the 3 Restroom buildings in attached plans and specs . • Contractor is responsible for all required permits and inspections . • Building 1 . Ticket Office / Restrooms Contractor is to provide and install all materials required for complete construction of building per plans and spec
- Status
- Closed
- Sector
- Waste Processing and Treatment, Metal, Water Supply and Storage, Commercial, Residential
- Location
- North Carolina, United States of America
- Updated
- 3 Nov 2026
- Source
- North Carolina Purchasing Group
ConstructChat
Ask ConstructChat about Henderson County Sports Complex Restroom Buildings Project
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Complete turnkey construction of the 3 Restroom buildings in attached plans and specs . • Contractor is responsible for all required permits and inspections . • Building 1 . Ticket Office / Restrooms Contractor is to provide and install all materials required for complete construction of building per plans and specs . To include , but not limited to Foundation , Slab , CMU and Metal stud framing and finishes , Electrical equipment , HVAC equipment , Interior partitions ( framed and pre fab ). • Building 2 . Picnic Shelter / Restrooms • Contractor is to provide and install all materials required for complete construction of building per plans and specs . To include but not limited to Foundation , Slab , CMU and Metal stud framing and finishes , Electrical equipment , HVAC equipment , Interior partitions ( framed and prefab ). • Building 3 . Existing storage / Restrooms • Contractor will provide slab for the existing storage building but is NOT responsible for moving existing building . • Contractor is to provide and install all materials required for complete construction of restrooms at end of slab as shown per plans and specs . To include but not limited to Foundation , Slab , Metal stud framing and finishes , Electrical equipment , HVAC equipment , Interior partitions ( framed and pre fab ). • Sewer , Water and Electrical will be stubbed at each building site . Awarded contractor will be required to make all connections . • Awarded contractor will need to coordinate with the site contractor for access to building site . • Awarded Contractor Must Provide a 1 - year warranty on all workmanship , materials and equipment from the completion date . |
Location
Country | United States of America (USA) |
State | North Carolina |
Source
Source | North Carolina Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Waste Processing and Treatment, Metal, Water Supply and Storage, Commercial, Residential |
Article published date | 2026-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
