Hillsdale High School Asbestos Removal Bids
Sector: Chemical (Industrial) • Location: MITN, United States of America
Source: MITN Purchasing Group
SCOPE OF WORK Hillsdale High School Containment Area 1 – Cafeteria , Stage , and Hallway Area ASBESTOS MATERIAL BUILDING LOCATIONS QUANTITY OF ACM Acoustical ceiling plaster system ( finish coat , scratch coat , and wire mesh ) Cafeteria , stage , and hallway east of cafeteria 6 , 534 sf Pipe insulation above acoustica
- Status
- Closed
- Sector
- Chemical (Industrial), Education, Manufacturing (Industrial), Commercial
- Location
- MITN, United States of America
- Updated
- 3 Nov 2026
- Source
- MITN Purchasing Group
ConstructChat
Ask ConstructChat about Hillsdale High School Asbestos Removal Bids
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | SCOPE OF WORK Hillsdale High School Containment Area 1 – Cafeteria , Stage , and Hallway Area ASBESTOS MATERIAL BUILDING LOCATIONS QUANTITY OF ACM Acoustical ceiling plaster system ( finish coat , scratch coat , and wire mesh ) Cafeteria , stage , and hallway east of cafeteria 6 , 534 sf Pipe insulation above acoustical plaster All areas of ceiling removal Unknown quantity , remove all TSI above ceilings in bid Containment Area 2 – Library Area ASBESTOS MATERIAL BUILDING LOCATIONS QUANTITY OF ACM Acoustical ceiling plaster system ( finish coat , scratch coat , and wire mesh ) Faculty dining , small kitchen , hallway , storage room , library , hallway east of library , and library storage 6 , 420 sf Pipe insulation above acoustical plaster All areas of ceiling removal Unknown quantity , remove all TSI above ceilings in bid 9 ” vinyl floor tile and mastic Hallway by library , storage room , small kitchen , faculty dining , and S . library storage 1 , 528 sf Containment Area 3 – Ceiling around columns outside Gymnasium ASBESTOS MATERIAL BUILDING LOCATIONS QUANTITY OF ACM Acoustical ceiling plaster system ( finish coat , scratch coat , and wire mesh ) Cutting around columns at trophy case in Gym lobby to facilitate removal of columns . Encapsulate edges of ceiling PROJECT NOTES : • All asbestos removal is to be completed in accordance with the applicable OSHA work practices . • Both phases will require TEM clearance , which will be conducted by BHI in accordance with AHERA / Michigan regulations and analyzed within 24 - hours of collection of the samples . • All lighting fixtures are to be removed , cleaned , and disposed of by the Abatement Contractor . The fluorescent tubes are to be removed and recycled . • The Abatement Contractor is to field check all ballasts located inside of the fluorescent light fixtures in the building to determine the presence of PCB ’ s by the label identification . All ballasts without labels clearly stating “ No PCB ’ s ” are to be packaged , transported , and disposed or recycled as PCB containing material by the Environmental Contractor in accordance with EPA regulations in 40 CFR 761 . • The floor tile mastic is to be removed by chemical or wet grinding . • All furniture and loose items will be removed from the work areas . The GC will remove shelving and cabinets from the areas of flooring removal . • The glass divider windows in the library can be left in - place or removed by the abatement contractor at their discretion . If the glass does not remain stable when the ceiling is cut down , then it must be removed and stacked outside the containment for disposal by the GC . |
Location
Country | United States of America (USA) |
State | MITN |
Source
Source | MITN Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Chemical (Industrial), Education, Manufacturing (Industrial), Commercial |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Chemical (Industrial) tenders in United States of America
- 2024 Glass Beads
- Chemical Biological Radiological Nuclear CBRN Respirators and Replacement Filters
- Antiscalant Chemical
- SUPPLY AND DELIVERY OF POLYMER
- Biosolids Digester Facilities Project Request / Notice for P...
- Sunol Valley Water Treatment Plant and Chloramination Facili...
- Sunol Valley Chemical Facility Improvements [BID TABULATION]
- Biosolids Digester Facilities Project - Southeast Water Poll...
