logo

HMA Skip Paving - M - 15 in Oakland County

One of 3,321 tenders Taiyo tracks in MITN.

Source: MITN Purchasing Group

Tender
Closed

This is a Request for Proposal ( RFP ) for services to perform HMA milling and paving along M - 15 between South of Granger Rd to County Line Rd . Work under this contract will require milling , removal and disposal of existing bituminous asphalt , installation of binder , installation of finished course of h

Status
Closed
Sector
Road, Government
Location
MITN, United States of America
Updated
3 Nov 2026
Source
MITN Purchasing Group

ConstructChat

Ask ConstructChat about HMA Skip Paving - M - 15 in Oakland County

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “HMA Skip Paving - M - 15 in Oakland County” is a tender record in Taiyo, linked to the Road sector. It is issued for works, goods, or services related to MITN, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

This is a Request for Proposal ( RFP ) for services to perform HMA milling and paving along M - 15 between South of Granger Rd to County Line Rd . Work under this contract will require milling , removal and disposal of existing bituminous asphalt , installation of binder , installation of finished course of hot mix asphalt , providing traffic control , installing shoulder line Corrugations , pavement markings , and other defined work . REQUIREMENTS General Requirements Contract Activities must be performed on three ( 3 ) consecutive weekends ( Saturday and Sunday ). The Contractor shall provide all labor , material , equipment , supervision , and any incidental services or items required to perform Contract Activities . Except where otherwise indicated within this Schedule A , all materials and workmanship shall be in accordance with the MDOT Standard Specifications for Construction , 2020 Edition [ see MDOT 2020 Standard Specifications for Construction [ WEB ]- linked ( michigan . gov )], and in accordance with any relevant / applicable Frequently Used Special Provisions ( 2020 ), and any relevant / applicable Supplemental Specifications ( 2020 ). At no point shall work begin without a representative from MDOT on site . The Contractor must not leave equipment and / or store equipment overnight on any trunkline , State right - of - way , or public recreational property during the performance of the Contract . The Contractor must not operate or park equipment or store materials within a tree drip line . All local noise , dust , and work - hour ordinances shall apply to the Contract . MDOT will not be responsible for any cost associated with the disposal of any service provided in the Contract . MDOT will not be responsible for any citations , fines or tickets received , while performing Contract Activities . The Contractor shall take any other actions themselves or as directed by MDOT , to protect the safety and health of the public , state employees , State property and property of the local unit of government during the performance of the Contract . The Contractor shall conduct and supervise work as to ensure its completion in accordance with the terms of this contract and the approved progress schedule . MDOT Program Manager reserves the right to shut down any construction operations if no proper communicable notice is received from the Contractor . Specific Requirements The approximate paving limits within the project area may be viewed in the Google Earth map at https :// earth . google . com / earth / d / 1QyWxHBNmpnPDiYPGpFHMNMwDuoweHJEC ? usp = sharing . Paving repair locations are estimated and provided for reference only . Actual work performed will be determined by the MDOT Program Manager . Final locations will be marked by the MDOT Program Manager or representative before the start of the project and are subject to change at the time of marking . DESCRIPTION OF SERVICES Work includes continuous cold milling and paving of two inches ( 2 ”) of the existing pavement , replacing pavement markings , shoulder line corrugations and milling and surfacing of approaches at the discretion of MDOT . Cold Milling and Hot Mix Asphalt All milling and paving work must be performed per Section 501 . Plant - Produced Hot Mix Asphalt of the MDOT 2020 Standard Specifications for Construction . All paving locations and limits will be determined and marked by MDOT prior to the start of milling operations . HMA surface removal depth and limits will be at the discretion of MDOT . Contractor may be required to cold mill and patch more than two inches ( 2 ”) to achieve the required cross - section and adequate base condition . Contractor must ensure the final pavement cross slope conforms to MDOT Standard Requirements of 2 . 0 % along the main traveled way and 4 . 0 % along the shoulder , unless otherwise approved in writing by the MDOT Program Manager . A uniform 2 . 0 % cross slope on the shoulder for ease of paving operations will not be permitted , as it may create a drop - off at the shoulder edge and require additional shoulder aggregate and / or restoration resulting from nonconforming pavement slopes . Any such non - compliance work shall be rejected and the corrective work shall be performed by the Contractor without any additional cost to MDOT . Traffic loops and traffic counters must be protected from damage during the cold milling operation . Any damage caused by the Contractor ’ s operations is not permitted unless explicitly approved in advance by the MDOT Program Manager . All milled areas shall be filled during the same closure in which they are milled , and no milled area shall remain unfilled longer than 12 hours from the time milling occurs . The mix for skip paving will be MDOT approved design 5EML with PG 70 - 28P binder . A minimum in - place compaction of at least 92 % will be required with third party density testing to be conducted at the discretion of the MDOT . Shoulder Line Corrugation , Milled , HMA Contractor must inventory all existing shoulder line corrugations prior to cold - milling the pavement . Contractor must re - install center line corrugations on the newly paved HMA surface per inventory and in accordance with MDOT Standard Plan for Shoulder and Center Line Corrugations , R - 112 - J ( see R - 112 - J ). The approximate start and stop locations of the shoulder corrugations within the project limit may be viewed in the Google Earth map at https :// earth . google . com / earth / d / 1WXL8X6J5PLn6W8_X21aqsmJqgSexMOqf ? usp = sharing . Final locations will be marked by the MDOT Program Manager or representative after the completion of final paving operations . This service item includes all labor , material , and equipment necessary to complete the work as described , including containment , collection , and disposal of spoils . No additional payment will be made for beadless waterborne layout lines . All other pavement marking payments will be paid for under the appropriate pavement marking pay items .

Location

Country

United States of America (USA)

State

MITN

Source

Source

MITN Purchasing Group

URL

More Details

Record type

Tender

Sector

Road, Government

Article published date

2026-04-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender