HMGP Acquisition / Demolition Project - Renovo Borough , Clinton County , PA
The scope, dates and status of this tender. A free account opens every field.
Source: Pennsylvania Purchasing Group
DESCRIPTION OF THE WORK : The Work comprises the demolition of all structures , garages , sheds , other ancillary property structures , private sidewalks ( public sidewalks to remain ), cap water and sewer laterals at curb line ( work with public works ), one water and sewer lateral in the middle shall be brought
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Commercial
- Location
- Pennsylvania, United States of America
- Updated
- 3 Nov 2026
- Source
- Pennsylvania Purchasing Group
ConstructChat
Ask ConstructChat about HMGP Acquisition / Demolition Project - Renovo Borough , Clinton County , PA
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | DESCRIPTION OF THE WORK : The Work comprises the demolition of all structures , garages , sheds , other ancillary property structures , private sidewalks ( public sidewalks to remain ), cap water and sewer laterals at curb line ( work with public works ), one water and sewer lateral in the middle shall be brought up to 3 ’ grade and capped , rubbish , asbestos abatement as needed , property restoration and all appurtenances for a complete job in accordance with the Contract Documents . All Structures have been declared unsafe to enter to complete the asbestos testing . The Engineer ’ s Certified Asbestos Inspector will be onsite during the demolition process . The building materials must be kept adequately wet at all times , starting with the demolition process , through site cleanup , transport and final disposal . " Adequately wet " means sufficiently wet to prevent the release of particulates and there are no visible emissions observed from any asbestos - containing material . If visible emissions are observed , the demolition must cease , and additional wetting must be performed until no emissions are occurring . However , the absence of visible emissions is not sufficient evidence of being adequately wet . For a complete discussion of the structurally unsound and in danger of imminent collapse provisions under the Asbestos NESHAP , please refer to 40 C . F . R . §§ 61 . 141 and 61 . 145 ( a )( 3 ), 61 . 145 ( c )( 4 ) -( 9 ). All correspondence must be made through the Vendor Portal . |
Location
Country | United States of America (USA) |
State | Pennsylvania |
Source
Source | Pennsylvania Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Waste Processing and Treatment, Water Supply and Storage, Commercial |
Article published date | 2026-05-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Waste Processing and Treatment tenders in United States of America
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Annual Construction Contract For Utility Replacement 2022A
- FY23 Sewer Rehabilitation
- Fire Station 32 ADA Restroom Improvements
- Foothills Trail East Puyallup McMillin Trailhead Improvements
- Pipeline Trail Phase 1 Project
