Home Repair Program - HVAC
Sector: Commercial • Location: MITN, United States of America
Source: MITN Purchasing Group
The City of Niles is looking for an HVAC provider to remove the old system and install a new HVAC system including AC as an alternate cost that meets the following criteria as well as all local and State codes : 1 . Clearance The furnace should have at least 3 feet of clearance on all sides ,
- Status
- Closed
- Sector
- Commercial, Residential
- Location
- MITN, United States of America
- Updated
- 3 Nov 2026
- Source
- MITN Purchasing Group
ConstructChat
Ask ConstructChat about Home Repair Program - HVAC
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The City of Niles is looking for an HVAC provider to remove the old system and install a new HVAC system including AC as an alternate cost that meets the following criteria as well as all local and State codes : 1 . Clearance The furnace should have at least 3 feet of clearance on all sides , with an additional 2 feet in the front for maintenance . 2 . Location The furnace should be installed in an area with adequate ventilation to prevent exhaust gases from building up . It should also be close to an electrical outlet and gas line . 3 . Combustion air The furnace needs to be able to take in enough combustion air . This can come from indoor or outdoor sources , and the size of the air supply opening depends on the furnace and ductwork . 4 . Ductwork The ducts should be properly sized and positioned to provide enough fresh air . They should also be inspected for leaks , which can harm the furnace ' s efficiency . 5 . Furnace size The furnace ' s size should be appropriate for the square footage of your home . 6 . Annual Fuel Utilization Efficiency ( AFUE ) The furnace should have an AFUE rating of at least 80 %. 7 . Circuit breaker Larger furnaces may require more than one circuit breaker . 8 . Manufacturer ' s instructions & Warranty 9 . The furnace manufacturer ' s instructions will be referenced prior to beginning installation and the warranty transferred to the homeowner upon installation . |
Location
Country | United States of America (USA) |
State | MITN |
Source
Source | MITN Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Commercial, Residential |
Article published date | 2026-05-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Commercial tenders in United States of America
- Sanitary Sewer Lateral Lining Pilot Program Section 230067500SA
- Trophies Plaques Awards ETC
- Painting Services for Building Exteriors Infrastructure Systems and Pressure Washing
- OAM Learning Management System
- CYBER SECURITY PENETRATION TESTING
- PROMOTIONAL ITEMS SOUVENIRS
- Proposed Services at Former Ingleside Recreation Center
- Towing Services CityOwned Vehicles Light and Heavy Duty
