Home Repair
Bids closed Apr 2026 · North Carolina · Last reported Apr 2026
Source: North Carolina Purchasing Group
9007 CLEAN TO CLEARANCE 1 . 00 SF_______________ Prior to final acceptance of the lead hazard reduction work and all rehabilitation work , the property shall be visually inspected for any remaining paint chips , dust and debris and lead dust wipe samples shall be obtained from floors , windows sills and wind
- Status
- Closed
- Sector
- Natural Gas, Metal, Chemical (Industrial), Steel, Water Supply and Storage, Rail, Manufacturing (Industrial), Commercial, Cement, Residential, Road
- Location
- North Carolina, United States of America
- Updated
- 3 Nov 2026
- Source
- North Carolina Purchasing Group
ConstructChat
Ask ConstructChat about Home Repair
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | 9007 CLEAN TO CLEARANCE 1 . 00 SF_______________ Prior to final acceptance of the lead hazard reduction work and all rehabilitation work , the property shall be visually inspected for any remaining paint chips , dust and debris and lead dust wipe samples shall be obtained from floors , windows sills and window troughs . The contractor meet the current HUD clearance level requirements for lead dust . The contractor shall re - clean all applicable components and surfaces and pay for all additional clearance dust sampling if any dust sample result exceed the current HUD clearance levels for lead dust . 9129 CLEAN TO CLEARANCE 1 . 00 SF _______________ After completion of all lead hazard reduction activities , wet mist , fold and remove all containment polyethylene sheeting . HEPA vacuum all visible surfaces including walls , floors , ceilings and window troughs from the top down . Detergent scrub all horizontal surfaces in small sections using a 3 - bucket system , changing rinse water every 250 SF . Completely rinse with clean water and new equipment . After surfaces are dry , HEPA vacuum all visible surfaces except ceiling . 9438 WINDOW - MISC REPAIR 12 . 00 EA _______________ Rewrap all the windows around the house . Window casing & Sills per lead - based paint report . 9494 DOOR - STABILIZE & MISC PAINT 1 . 00 EA________________ STABILIZE AND PAINT . SIDE D - LEFT . DOOR CASING , DOOR JAMB , AND THRESHOLD . 9532 EXTERIOR DOOR -- REPLACE WITH METAL PREHUNG 1 . 00 EA________________ After establishing any required floor containment with polyethylene sheeting , wet mist , remove , wrap in polyethylene sheeting and dispose of door , frame and casing . Install a prehung , insulated , 4 panel , metal skinned door including magnetic weather stripping , interlocking threshold , wide angle peep site , dead bolt and entrance locksets . Retrim opening with 1 " x 6 " casing and brick molding . Prime and prep all wood with premium acrylic latex . SHED DOOR UNDER CARPORT . 9642 ENCLOSE SHEATHING / VINYL 1 . 00 SF________________ Apply 1 / 4 " composition board vapor barrier to enclose to lead containing paint . Protect board with vinyl siding and aluminum or vinyl wrapped trim installed in accordance with manufacturer ' s specifications . Owner ' s choice of pattern , color and embossing . THE ORIGINAL VINYL SIDING WILL BE RE INSTALLED . CLEAN TO CLEARANCE . Environmental Rehab 9657 ENCLOSE TRIM -- ALUMINUM 1 . 00 LF ________________ After establishing any required ground containment with polyethylene sheeting , mark " Lead Paint " every 10 linear feet . Enclose trim with . 024 white aluminum formed on a machine brake with tight lap joints , folded hem edges and accurately fitted connections . Back caulk all seams with 25 year siliconized acrylic and flash head joints to create an weathertight seal . HEPA vacuum all paint chips , dust and debris . FRONT PORCH HEADER & FACIA AROUND THE HOUSE . 9658 ENCLOSE SOFFIT -- ALUMINUM 1 . 00 LF ________________ After establishing any required ground containment with polyethylene sheeting , mark " Lead Paint " every 10 linear feet . Enclose trim with . 027 aluminium non - vented soffit panels , color selected by owner . Back caulk all seams with siliconized acrylic to create a weathertight seal . HEPA vacuum all visible paint chips , dust and debris . 9693 ENCLOSE PORCH CEILING -- PLYWOOD 1 . 00 SF________________ After establishing any required ground containment with polyethylene sheeting , mist defective paint with water to the point of saturation . Wet scrape and HEPA vacuum any visible paint chips , dust and debris . Mark ceiling " Lead Paint " 4 ' on center . Apply a 3 / 8 " BCX plywood ceiling with 7d screw shank nails , 8 " on center and B side exposed . Trim perimeter with 1 / 4 round and seams with 2 " lattice . Prime and top coat with premium acrylic latex . REMOVE THE VINYL , ENCAPSULATE AND REINSTALL VINYL . CLEAN TO CLEARANCE . Carpentry 2974 WINDOW REPLACE -- VINYL -- SGL HNG ENERGY STAR - 1 . 00 EA ________________ W / TRIM > 100 UI Replace existing window that is > ( greater than ) 100 UI ( United Inches ). After establishing any required floor containment with polyethylene sheeting , wet mist , remove , wrap in polyethylene sheeting and dispose of any components containing Lead Based Paint . Detergent wash , rinse , allow to dry and HEPA vacuum any paint chips , dust and debris . Field measure and install a PVC , 1 over 1 , single hung , double glazed , Low E window that meets the ENERGY STAR standards for this climate for U value and SHGC , and is AAMA certified per AAMA / WDMA / CSA 101 / I . S . 2 / A440 - 11 . Include 1 / 2 screen . Wrap exterior jamb and sill with . 027 " aluminum coil stock back caulked and nailed 6 " on center . Re - trim opening with casing , apron and stool to match existing . Prep for paint . LAST WINDOW ON THE RIGHT SIDE OF HOME . 3160 DOOR -- INSULATED METAL Front & Back Door 2 . 00 EA ________________ Install a 6 - panel , insulated metal door on the existing jamb , with entrance lockset and mortised dead bolt keyed alike . Include three 4 " x 4 " hinges , interlocking threshold , neoprene weatherstripping , and wide angle peepsight . Prime and topcoat . 3520 PORCH HAND RAIL -- 2 " X 4 " Front & Back Steps 2 . 00 LF ________________ Install preservative treated 2 " x 4 " handrail supported by 4 " x 4 " treated posts , 4 ' on center . Rail to be free from cracks , splinters , and rough edges . Set first post in a 12 " x 8 " x 12 " concrete sleeve , bolt remaining posts to stringer with 7 " lags . Roofing 4546 EPDM -- FULLY ADHEARED 1 . 00 SQ ________________ Clean all loose materials off of roof . Install manufacturers approved underlayment board . Install a 60 mil EPDM single ply membrane with adhesive per manufacturer ' s specs . All membrane flashing , metal flashings and counter flash cones , as well as installation procedure to follow manufacturer ' s specs . Furnish Owner w / 20 year labor and materials warranty . 4580 TEAR OFF AND REROOF SHINGLES 1 . 00 SQ ________________ Remove and dispose of all roofing & defective sheathing . Cut a 1 " wide vent at ridge board . Replace up to 200 sf of sheathing roof using pine board or CDX plywood of matching thickness . Staple 15 lb felt . Install preformed white aluminum , drip edge , and vent pipe boots . Install a 220 lb fiberglass asphalt , 3 tab shingle with a 25 yr warranty . Replace all flashing . Install shingle - over ridge vent . HVAC 6059 PACKAGE - UNIT -- REPLACE -- AC WITH NATURAL GAS 1 . 00 EA ________________ HEAT -- WITH DUCTWORK Use the Air Conditioning Contractors of America ' s ( ACCA ) late test edition of their Manual J calculation tool http :// www . acca . org / tech / manualj / ( calculate manual J based on the post rehab building envelope ), use ACCA ' s Manual S for equipment selection and use Manual D for ductwork design . Make every effort to install supply ducts in interior partitions ( in conditioned wall cavities ). NOTE : Provide Manual J , S and D reports before work begins . Size furnace to the living unit considering any areas which may be added or subtracted from the plan . Remove existing package unit , recycle all metal components and dispose of all other materials in a code legal dump . Install a package unit with a heat pump rated at a minimum of 15 SEER for cooling and a natural gas fired backup burner with a minimum AFUE rating of 81 % or higher , |
Location
Country | United States of America (USA) |
State | North Carolina |
Source
Source | North Carolina Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Natural Gas, Metal, Chemical (Industrial), Steel, Water Supply and Storage, Rail, Manufacturing (Industrial), Commercial, Cement, Residential, Road |
Article published date | 2026-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
