Hook - Lift Asphalt Patch Body
Closed · Idaho · Last reported Jan 2026
Source: Idaho Purchasing Group
The Hook - Lift Asphalt Patch Body Unit must be designed and built to work on ITD ’ s existing Stellar Industries Model 138 - 18 - 40 Hooklift System . Hook lift system is not required as part of this bid . Hook - Lift Asphalt Patch Body must be fully assembled and operational at time of delivery to inclu
- Status
- Closed
- Sector
- Power Generation (CCGT), Steel, Road
- Location
- Idaho, United States of America
- Updated
- 3 Nov 2026
- Source
- Idaho Purchasing Group
ConstructChat
Ask ConstructChat about Hook - Lift Asphalt Patch Body
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Hook - Lift Asphalt Patch Body Unit must be designed and built to work on ITD ’ s existing Stellar Industries Model 138 - 18 - 40 Hooklift System . Hook lift system is not required as part of this bid . Hook - Lift Asphalt Patch Body must be fully assembled and operational at time of delivery to include but not limited to the options and features detailed below . Powder Coat : Hook - Lift Asphalt Patch Body must be cleaned and powder coated by the manufacturer ’ s process for the application . The finish coat ( s ) must be a minimum dry thickness of four ( 4 ) mil total . The Hook - Lift Asphalt Patch Body must be smooth and free of rust , runs , overspray , peeling , weld splatter , and other defects . Color : Patch Body – Black . Hopper : Capacity – Six and a quarter ( 6 . 25 ) cubic yard ; Construction – Entire container must be double steel jacket with a two ( 2 ) inch high temperature insulation . Fifty ( 50 ) degree side and end wall slope . Sides and floor must have two ( 2 ) inch cavity for heat transfer fluid to properly retain heat . Top Hopper Doors : Construction – Hydraulically operated bio - fold doors . Double steel jacket construction with a one ( 1 ) inch high temperature insulation . Hinged so that in the open position the loaded material will be funnel toward the center of container . Hinges must have guards to keep asphalt out of the hinge . Cylinders : Heat shielded and high temperature rated door cylinders . Hydraulically Driven Auger : Must have controls for forward / reverse with two ( 2 ) settings , one ( 1 ) normal dispense and one ( 1 ) hopper unload ; Hydraulically Driven Agitator : Length of full hopper ; Controls – Forward / reverse switch must be momentary . Hydraulic System Power Unit : Type – Twenty - four ( 24 ) HP Kubota D1105 diesel or equal ; Controls – Deep Sea Electronics ( DSC ) controller or equal ; Fuel Tank – Thirteen ( 13 ) gallons ; Hoses – All hoses rated above three thousand ( 3 , 000 ) PSI working pressure ; Pump – Variable displacement piston pump coupled to power unit ... |
Location
Country | United States of America (USA) |
State | Idaho |
Source
Source | Idaho Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Power Generation (CCGT), Steel, Road |
Article published date | 2026-05-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Power Generation (CCGT) tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Security Hardware Services
- 23B49SR Marine Science Center Turtle Canopy
- Purchase and Supply of Engine Oil for the McIntosh Reciprocating Engine Project MREP
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- PreQualification of Bidders for Chaboya Improvements
