logo

Housing Rehab - Rogers County

The scope, dates and status of this tender. A free account opens every field.

Source: Oklahoma Purchasing Group

Tender
Closed

The Housing Authority of the Cherokee Nation is seeking bids from interested parties for the rehabilitation of one home located in Rogers County . Work will be completed according to the work write - up . Specifications include , but are not limited to : Carpentry : BATHROOM # 1 12 LF Base Trim / Pine , K - Patte

Status
Closed
Sector
Road, Cement, Metal, Steel, Residential
Location
Oklahoma, United States of America
Updated
3 Nov 2026
Source
Oklahoma Purchasing Group

ConstructChat

Ask ConstructChat about Housing Rehab - Rogers County

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Housing Rehab - Rogers County” is a tender record in Taiyo, linked to the Road sector. It is issued for works, goods, or services related to Oklahoma, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The Housing Authority of the Cherokee Nation is seeking bids from interested parties for the rehabilitation of one home located in Rogers County . Work will be completed according to the work write - up . Specifications include , but are not limited to : Carpentry : BATHROOM # 1 12 LF Base Trim / Pine , K - Pattern 2 - 1 / 4 " Solid / Stain Grade / Replace . Replace base trim , K - Trim , solid pine , 2 - 1 / 4 ". Stain & Finish . BEDROOM # 2 1 Ea Door Opening / Widen / Interior / Widen interior door to 32 " opening / Install new door / pre - hung . Work shall include new door , framing , lockset , floor transition , paint and trim . BATHROOM # 1 Door Opening / Widen / Interior / Widen interior door to 36 " opening / Install new door / pre - hung . Work shall include new door , framing , lockset , floor transition , paint and trim . Move door over enough for the 32 " shower to fit ; LIVING ROOM # 1 1 Ea Door / Exterior / Fan Light Faced / Pre - Hung Metal Insulated / Replace . Replace exterior entrance door with new pre - hung steel , door . Work shall include paint - both sides , lockset , deadbolt & peephole . BATHROOM # 1 24 SF Furr Wall or Ceiling . Furr out area ( see comments ) to plane with existing surfaces . Furr wall out 2 " closer to the toilet to make the 32 " shower fit ; LIVING ROOM # 1 1 Ea Storm Door / White Vinyl Clad / Install . Install new storm door , vinyl clad . Use Larson model 298 - SS or written approved equal . BATHROOM # 1 60 SF Subfloor / Remove the existing flooring . Replace subfloor with new 3 / 4 " smooth plywood . Replace top layer of the floor match exsisting thickness ; EXTERIOR 15 LF Wheel Chair Ramp / Wood / Install new 4 ' wide Treated Wood wheel chair ramp , with balusters , handrails on both sides and concrete landing at the bottom . Come straight out from front porch to a 5x5 turn around and ramp back down toward driveway ; Drywall & Finish : BATHROOM # 1 64 SF Drywall / Moisture Resistant / Replace . Replace drywall with moisture resistant drywall - 1 / 2 ". includes mud , tape and finish . HALLWAY # 1 8 SF Drywall / Wall / Replace 1 / 2 " drywall on wall / Finish completely . Work shall include tape , bed , texture and paint to match existing surfaces . On outside of bathroom door where it was moved over

Location

Country

United States of America (USA)

State

Oklahoma

Source

Source

Oklahoma Purchasing Group

URL

More Details

Record type

Tender

Sector

Road, Cement, Metal, Steel, Residential

Article published date

2026-04-08

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender