Housing Rehab - Rogers County
The scope, dates and status of this tender. A free account opens every field.
Source: Oklahoma Purchasing Group
The Housing Authority of the Cherokee Nation is seeking bids from interested parties for the rehabilitation of one home located in Rogers County . Work will be completed according to the work write - up . Specifications include , but are not limited to : Carpentry : BATHROOM # 1 12 LF Base Trim / Pine , K - Patte
- Status
- Closed
- Sector
- Road, Cement, Metal, Steel, Residential
- Location
- Oklahoma, United States of America
- Updated
- 3 Nov 2026
- Source
- Oklahoma Purchasing Group
ConstructChat
Ask ConstructChat about Housing Rehab - Rogers County
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Housing Authority of the Cherokee Nation is seeking bids from interested parties for the rehabilitation of one home located in Rogers County . Work will be completed according to the work write - up . Specifications include , but are not limited to : Carpentry : BATHROOM # 1 12 LF Base Trim / Pine , K - Pattern 2 - 1 / 4 " Solid / Stain Grade / Replace . Replace base trim , K - Trim , solid pine , 2 - 1 / 4 ". Stain & Finish . BEDROOM # 2 1 Ea Door Opening / Widen / Interior / Widen interior door to 32 " opening / Install new door / pre - hung . Work shall include new door , framing , lockset , floor transition , paint and trim . BATHROOM # 1 Door Opening / Widen / Interior / Widen interior door to 36 " opening / Install new door / pre - hung . Work shall include new door , framing , lockset , floor transition , paint and trim . Move door over enough for the 32 " shower to fit ; LIVING ROOM # 1 1 Ea Door / Exterior / Fan Light Faced / Pre - Hung Metal Insulated / Replace . Replace exterior entrance door with new pre - hung steel , door . Work shall include paint - both sides , lockset , deadbolt & peephole . BATHROOM # 1 24 SF Furr Wall or Ceiling . Furr out area ( see comments ) to plane with existing surfaces . Furr wall out 2 " closer to the toilet to make the 32 " shower fit ; LIVING ROOM # 1 1 Ea Storm Door / White Vinyl Clad / Install . Install new storm door , vinyl clad . Use Larson model 298 - SS or written approved equal . BATHROOM # 1 60 SF Subfloor / Remove the existing flooring . Replace subfloor with new 3 / 4 " smooth plywood . Replace top layer of the floor match exsisting thickness ; EXTERIOR 15 LF Wheel Chair Ramp / Wood / Install new 4 ' wide Treated Wood wheel chair ramp , with balusters , handrails on both sides and concrete landing at the bottom . Come straight out from front porch to a 5x5 turn around and ramp back down toward driveway ; Drywall & Finish : BATHROOM # 1 64 SF Drywall / Moisture Resistant / Replace . Replace drywall with moisture resistant drywall - 1 / 2 ". includes mud , tape and finish . HALLWAY # 1 8 SF Drywall / Wall / Replace 1 / 2 " drywall on wall / Finish completely . Work shall include tape , bed , texture and paint to match existing surfaces . On outside of bathroom door where it was moved over |
Location
Country | United States of America (USA) |
State | Oklahoma |
Source
Source | Oklahoma Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Road, Cement, Metal, Steel, Residential |
Article published date | 2026-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
