Scope of Work Replacement Home 1 . Davis - Bacon Wage Rates are applicable to this project and are included . 2 . This will be a turnkey job and must be completed in 120 working days . The contractor shall bid to furnish all necessary labor , quality control , licenses , material , equipment , tools , supplies , p

Status
Closed
Sector
Water Supply and Storage, Wind, Metal, Waste Processing and Treatment, Power Transmission, Residential, Power Generation (CCGT), Commercial
Location
Oklahoma, United States of America
Updated
3 Nov 2026
Source
Oklahoma Purchasing Group

ConstructChat

Ask ConstructChat about Housing Replacement - Muskogee County

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Housing Replacement - Muskogee County” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to Oklahoma, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Scope of Work Replacement Home 1 . Davis - Bacon Wage Rates are applicable to this project and are included . 2 . This will be a turnkey job and must be completed in 120 working days . The contractor shall bid to furnish all necessary labor , quality control , licenses , material , equipment , tools , supplies , permits and insurance and supervision to perform the work required thereof within the time specified after the receipt of “ Notice to proceed . 3 . Please refer to ( ADA ) Housing Accessibility Sheet in Bid Packet for any special instructions on materials for ADA compatibility . Example : Hearing impaired will need strobes on fire alarms ... wheelchair bound patients will need ADA flush roll - in showers with fold down seats . All units will receive 2 handicap rails at the toilet and 2 at the shower locations . 4 . The Contractor shall verify , on the job site , all quantities , measurements or dimensions , conditions , plans , scope of work and write up before submitting this bid . There will be no Change Order to prices based on mistaken quantity count , measurements , or dimensions . It is the contractor ’ s responsibility to inspect the sites and familiarize themselves with any existing conditions . 5 . The contractor will be responsible for building permits , inspection fees , sewer taps , and meeting all city / state building codes and covenants if applicable . The contractor will be responsible for temporary utilities and connecting all utilities to the home upon completion of all work , including hooking to electric ( HACN requires underground from home to meter ), water , and sewer . All utility connections and equipment will be checked and service available , except for those services customarily provided by utility companies after occupancy . The contractor will be responsible for hooking home to all utilities . 6 . All City utilities available . 7 . Payments will be in three phases as follows : First phase , thirty ( 30 %) upon completion of the slab , submission of Original TERMITE CERTIFICATE for footing and pad and inspection report indicating that the work site is free and clear of any trash and debris . A copy of the 7 - day break on the footing will be required . Second phase , thirty ( 30 %) upon completion and acceptance dry - in ( windows , entry doors , plumbing , and electrical roughed in , ( shingles installed ) siding , and an inspection report indicating that the work site is free and clear of any trash and debris . A copy of the 7 - day break on the slab will be required . The Final phase , forty percent ( 40 %) upon completion of new home ( 100 %) ( Final grade , driveways , 1 ’ perimeter treated around home ) and an amended Termite Certificate to indicate that the perimeter surrounding the home has been treated . Payments will be paid upon completion and acceptance of work and approved by the Housing Authority of the Cherokee Nation inspector . Draws will be per unit . The contractor shall , at all times keep the work area clean , including storage areas free from accumulations of waste materials . Contractors must set dumpsters at all sites . The contractor shall place a Portable / Johnny at each site and post all proper documents for this project . After completing the work and before final inspection the contractor shall remove all equipment , tools , materials , the work area shall be left in a clean , neat , and orderly condition satisfactory to the HACN Inspector . 8 . All work must be performed in a workmanlike manner . 9 . Exterior Walls . Total R - Value must be R - 13 or better . Contractor shall install ½ ” OSB and house wrap . House wrap needs to cover all exterior walls and gables . The attic over heated space shall have an R - 38 value . Soffit baffles will be utilized between all roof joists for ventilation . 10 . All wiring penetrations in wall plates must be foamed and sealed . 11 . Doors : Contractor shall install 6 - panel interior primed Masonite doors throughout the home . Exterior doors will be 6 - panel metal clad with silicone sealer under the thresholds to create water / moisture barrier , and a Storm door will be installed on all exterior doors , storm door will be white Larson Vinyl Clad or approved “ equal to ”. Safety Chains on front and back storm doors to prevent wind damage .

Location

Country

United States of America (USA)

State

Oklahoma

Source

Source

Oklahoma Purchasing Group

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Wind, Metal, Waste Processing and Treatment, Power Transmission, Residential, Power Generation (CCGT), Commercial

Article published date

2026-04-08

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender