HOV63 - Re-evaluation of Project Planning Design
The scope, dates and status of this tender. A free account opens every field.
Source: TED Europa
Landsvirkjun hereby invites tenders for engineering consultancy services for the re-evaluation of the project planning design for the Holtavirkjun hydropower plant in the lower Þjórsá river in Iceland. The Services include review of an outdated design (draft AACE stage 2), finalisation of required design revisions to issue a preliminary design (AACE stage 3), and preparation of information require
- Status
- Closed
- Sector
- Hydro, Residential
- Location
- Iceland
- Updated
- 3 Nov 2026
- Source
- TED Europa
ConstructChat
Ask ConstructChat about HOV63 - Re-evaluation of Project Planning Design
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | contract notice |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Landsvirkjun hereby invites tenders for engineering consultancy services for the re-evaluation of the project planning design for the Holtavirkjun hydropower plant in the lower Þjórsá river in Iceland. The Services include review of an outdated design (draft AACE stage 2), finalisation of required design revisions to issue a preliminary design (AACE stage 3), and preparation of information required to finalise the environmental impact assessment (EIA) for the project. |
Original sector | Architectural, construction, engineering and inspection services |
Location
Country | Iceland |
Source
Source | TED Europa |
URL |
More Details
Record type | Tender |
Sector | Hydro, Residential |
Article published date | 2026-09-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
