https://platformazakupowa.pl/transakcja/1233786
Sector: Water Supply and Storage • Location: Poland
Source: TED Europa
3.1. Przedmiot umowy obejmuje dostawę i montaż wraz z uruchomieniem instalacji OZE: a) paneli fotowoltaicznych dla obiektów zlokalizowanych na terenie gminy – ilość instalacji 160 szt., o łącznej mocy 1134,9 kW b) montaż 2 instalacji fotowoltaicznej na BUP – o mocy 59,6 kW c) montaż 8 falowników hybrydowych dla BUP d) magazynów energii dla instalacji fotowoltaicznych w ilości 160 sztuk dl
- Status
- Closed
- Sector
- Water Supply and Storage, Oil and Gas, Nuclear, Solar, Power Generation (CCGT), Commercial
- Location
- Poland
- Updated
- 3 Nov 2026
- Source
- TED Europa
ConstructChat
Ask ConstructChat about https://platformazakupowa.pl/transakcja/1233786
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | contract notice |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | 3.1. Przedmiot umowy obejmuje dostawę i montaż wraz z uruchomieniem instalacji OZE: a) paneli fotowoltaicznych dla obiektów zlokalizowanych na terenie gminy – ilość instalacji 160 szt., o łącznej mocy 1134,9 kW b) montaż 2 instalacji fotowoltaicznej na BUP – o mocy 59,6 kW c) montaż 8 falowników hybrydowych dla BUP d) magazynów energii dla instalacji fotowoltaicznych w ilości 160 sztuk dla obiektów zlokalizowanych na terenie gminy i pojemności 1184 kWh e) magazynów energii dla instalacji fotowoltaicznych w ilości 10 sztuk dla BUP i pojemności 205 kWh f) montaż 1 pompy ciepła o mocy min. 9 kW 3.2. Szczegółowy opis przedmiotu zamówienia zamieszczony jest w Programie Funkcjonalno-Użytkowym stanowiącym załącznik nr 2 do SWZ. 3.3. Dostawa obejmuje urządzenia fabrycznie nowe i nie używane. Wykonawca zapewni w cenie oferty odbiór, szkolenie i instruktaż użytkowników. 3.4. Zamawiający wymaga 10 letniej gwarancji na konstrukcję montażową pod moduły fotowoltaiczne. 3.5. Wykonawca powinien przewidzieć i wycenić w swojej ofercie, że około 10% instalacji zostanie zamontowana na gruncie. |
Original sector | Construction work, Petroleum products, fuel, electricity and other sources of energy, Electrical machinery, apparatus, equipment and consumables; lighting, Construction work, Architectural, construction, engineering and inspection services, Construction work, Construction work, Architectural, construction, engineering and inspection services, Construction work, Construction work, Petroleum products, fuel, electricity and other sources of energy, Petroleum products, fuel, electricity and other sources of energy |
Location
Country | Poland |
Source
Source | TED Europa |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Oil and Gas, Nuclear, Solar, Power Generation (CCGT), Commercial |
Article published date | 2026-01-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in Poland
- Dostawa 80 Mg flokulantu w postaci emulsji do wspomagania procesu odwadniania osadów z Oczyszczalni Ścieków w Szlachęcinie, Mosinie i Borówcu.
- Dostawa urządzeń ogólnolaboratoryjnych w podziale na pakiety, znak sprawy: AEZ/S-056/2026
- Renowacja bezwykopowa burstlining kanału sanitarnego DN 500 ul. Dojlidy Fabryczne w Białymstoku
- Modernizacja pięciu punktów pomiarowych zamontowanych na magistralach wodociągowych, zlokalizowanych na terenie m. st. Warszawy, z podziałem na Zadania
- Opracowanie Projektu Strefowania i dokumentacji projektowej dla Zadania „Opomiarowanie sieci w terenie – wykonanie 24 szt. nowych punktów pomiarowych na sieci wodociągowej m.st. Warszawy i Pruszkowa”
- Budowa ujęcia SUW Święcice
- Zaprojektowanie (w zakresie branży srk) i kompleksowe wykonanie robót budowlanych na linii kolejowej nr 622 na odcinku G Gdów – Szczyrzyc w ramach Projektu pn. „Budowa nowej linii kolejowej Podłęże – Szczyrzyc – Tymbark / Mszana Dolna oraz modernizacja istniejącej linii kolejowej nr 104 Chabówka – Nowy Sącz – Etap II”
- Wykonanie robót budowlanych FAZY I na parkingu Parkuj i Jedź P+R Połczyńska w Warszawie
