logo

Humbolt Pacific Crest Trail Bridge Replacement

Sector: Raw Materials • Location: Bridgeport, California, United States of America

Source: SAM.gov

Tender
Combined Synopsis/Solicitation

Rev1 VIRTUAL PRE-BID MEETING The Virtual pre-bid meeting will be held on Microsoft Teams on Friday, November 6 at 10:00am PST. Please join via the below link or phone number. A video of the site will be shared during the pre-bid, so please join via computer if possible. Please note: if you are joining via a computer, you do not need to create a Teams account to join the meeting (if you don’t wish)

Status
Prospective
Sector
Raw Materials
Location
Bridgeport, California, United States of America
Updated
3 Nov 2026
Source
SAM.gov

ConstructChat

Ask ConstructChat about Humbolt Pacific Crest Trail Bridge Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Humbolt Pacific Crest Trail Bridge Replacement” is a tender record in Taiyo, linked to the Raw Materials sector. It is issued for works, goods, or services related to Bridgeport, California, United States of America.

Participants

Not available for this record.

Status

Original status

combined synopsis/solicitation

Taiyo status

Prospective

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Rev1 VIRTUAL PRE-BID MEETING The Virtual pre-bid meeting will be held on Microsoft Teams on Friday, November 6 at 10:00am PST. Please join via the below link or phone number. A video of the site will be shared during the pre-bid, so please join via computer if possible. Please note: if you are joining via a computer, you do not need to create a Teams account to join the meeting (if you don’t wish). Just cancel the “open Teams” window, then select the “join through browser” option. If you are calling from a phone and don’t already have an account, use the phone number and meeting ID below. https://teams.microsoft.com/meet/2468609727966558?p=WAkhAgBGrwO9mYB2Su HUMBOLDT TRAIL BRIDGE REPLACEMENT Pacific Coast (PCT) Forest: Humboldt-Toiyabe National Forest (HTNF) Bridgeport Ranger Station The purpose of this project is to replace the Pacific Crest Trail (PCT) trail bridge over the West Fork West Walker River. The bridge is located in a remote location of the Hoover Wilderness, where there is no motorized access. Due to the remoteness of the location, Site Visit will be conducted by Zoom. Offerors are permitted to visit the site at their convenience. ATTACHMENTS: C04a ScheduleOfItems_SectionB_1240LT27Q0026 C04b DesignDrawings_1240LT27Q0026 C04c DOL Wage_CA20260020 07.30.2026_1240LT27Q0026 C04d Experience Questionnaire_1240LT27Q0026 C04e Past Performance Data Sheet_1240LT27Q0026 AWARD SCHEDULE: Site Visit: Friday, November 6 at 10:00am PST on Zoom Q&A Due Date: 11/04/2026 Quotes Due Date: 11/28/2026 - 1700 MT Anticipated Award Date: 12/10/2026 POP: July/01/2027 - 10/29/2027 = 120 days Contracting Officer Representative: Jordan Burge Civil Engineer - FS-IRR4-HNF-RELMHS jordan.burge@usda.gov

Original sector

Construction

Location

Country

United States of America (USA)

State

California

City

Bridgeport

Source

Source

SAM.gov

URL

More Details

Record type

Tender

Sector

Raw Materials

Article published date

2026-11-03

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender