Humbolt Pacific Crest Trail Bridge Replacement
Sector: Raw Materials • Location: Bridgeport, California, United States of America
Source: SAM.gov
Rev1 VIRTUAL PRE-BID MEETING The Virtual pre-bid meeting will be held on Microsoft Teams on Friday, November 6 at 10:00am PST. Please join via the below link or phone number. A video of the site will be shared during the pre-bid, so please join via computer if possible. Please note: if you are joining via a computer, you do not need to create a Teams account to join the meeting (if you don’t wish)
- Status
- Prospective
- Sector
- Raw Materials
- Location
- Bridgeport, California, United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Humbolt Pacific Crest Trail Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | combined synopsis/solicitation |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Rev1 VIRTUAL PRE-BID MEETING The Virtual pre-bid meeting will be held on Microsoft Teams on Friday, November 6 at 10:00am PST. Please join via the below link or phone number. A video of the site will be shared during the pre-bid, so please join via computer if possible. Please note: if you are joining via a computer, you do not need to create a Teams account to join the meeting (if you don’t wish). Just cancel the “open Teams” window, then select the “join through browser” option. If you are calling from a phone and don’t already have an account, use the phone number and meeting ID below. https://teams.microsoft.com/meet/2468609727966558?p=WAkhAgBGrwO9mYB2Su HUMBOLDT TRAIL BRIDGE REPLACEMENT Pacific Coast (PCT) Forest: Humboldt-Toiyabe National Forest (HTNF) Bridgeport Ranger Station The purpose of this project is to replace the Pacific Crest Trail (PCT) trail bridge over the West Fork West Walker River. The bridge is located in a remote location of the Hoover Wilderness, where there is no motorized access. Due to the remoteness of the location, Site Visit will be conducted by Zoom. Offerors are permitted to visit the site at their convenience. ATTACHMENTS: C04a ScheduleOfItems_SectionB_1240LT27Q0026 C04b DesignDrawings_1240LT27Q0026 C04c DOL Wage_CA20260020 07.30.2026_1240LT27Q0026 C04d Experience Questionnaire_1240LT27Q0026 C04e Past Performance Data Sheet_1240LT27Q0026 AWARD SCHEDULE: Site Visit: Friday, November 6 at 10:00am PST on Zoom Q&A Due Date: 11/04/2026 Quotes Due Date: 11/28/2026 - 1700 MT Anticipated Award Date: 12/10/2026 POP: July/01/2027 - 10/29/2027 = 120 days Contracting Officer Representative: Jordan Burge Civil Engineer - FS-IRR4-HNF-RELMHS jordan.burge@usda.gov |
Original sector | Construction |
Location
Country | United States of America (USA) |
State | California |
City | Bridgeport |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Raw Materials |
Article published date | 2026-11-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Raw Materials tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Hay Cutting and Removal for Jordan Farm and Coleman Farm
- Antiscalant Chemical
- As-Needed Sewer Inspection (FY23) [BID TABULATION]
- Landscaping (C-27 License), San Francisco, San Mateo, Santa ...
- Van Ness Avenue Auxiliary Water Supply System Upgredes
- Sunol Valley Water Treatment Plant Ozonation
- Oceanside Water Pollution Control Plant Digester Gas Utiliza...
