HVAC at Centennial Middle School
Bids closed Mar 2026 · Oklahoma · Last reported Feb 2026
Source: Oklahoma Purchasing Group
• Hail Guard • New Disconnect • New Honeywell VisionPro 8000 Thermostat ( except for units with energy management systems ) • Run new thermostat wire if needed for 2 stage operation • Economizer on units 7 . 5 ton and larger . Manual fresh air on 6 ton units and under . • Unit numbered with the same number
- Status
- Closed
- Sector
- Metal, Manufacturing (Industrial)
- Location
- Oklahoma, United States of America
- Updated
- 3 Nov 2026
- Source
- Oklahoma Purchasing Group
ConstructChat
Ask ConstructChat about HVAC at Centennial Middle School
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | • Hail Guard • New Disconnect • New Honeywell VisionPro 8000 Thermostat ( except for units with energy management systems ) • Run new thermostat wire if needed for 2 stage operation • Economizer on units 7 . 5 ton and larger . Manual fresh air on 6 ton units and under . • Unit numbered with the same number as old unit ( permanent and neat ) • Copper traps and drain lines • Copper union on drain line immediately after it exits unit so that drain can be disconnected from unit for cleaning • Elec . outlet within 25ft • Drain pan float switch • Nothing should be attached or screwed in to top plate of unit • Please check compressor rotation at startup ; If the unit has an ECM blower motor , you cannot use blower rotation to check unit for proper phasing . The ECM blower motor will always have the correct rotation no matter how the unit is phased . The compressor should always be checked independently for proper rotation even if it is cold outside . • Please burn off any residue on heat exchanger and attempt to direct smoke out of the unit on the roof . Inform school if there is any chance that this will set off fire alarm . • If unit is on Energy Management System , it is the contractor ’ s responsibility to reinstall it correctly . ( Sub Panco ) • Please set up Economizer for ‘’ D ” Setting • Set minimum outdoor air damper position to 10 %. • Low Pressure safety for safeties installed to break red . Not applicable if unit has factory installed low pressure safety . |
Location
Country | United States of America (USA) |
State | Oklahoma |
Source
Source | Oklahoma Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Metal, Manufacturing (Industrial) |
Article published date | 2026-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Metal tenders in United States of America
- Token Creek Roof Replacements
- HVAC Ice Machine Servicing and Sheet Metal Fabrication
- Jail Courthouse Walkway Project
- RFP 887702021MF Rapid Response Fire Boat for Norfolk FireRescue
- Various Locations Sewer Replacement No. 9 [BID TABULATION]
- Millbrae Warehouse Loading Dock Repair
- Biosolids Digester Facilities - Southeast Treatment Plant T-...
- Electrical (C-10 License), San Francisco, San Mateo, Santa C...
