HVAC Removal and Replacement – 2 x Furnaces and 2 x Air Conditioning Units
Sector: Manufacturing (Industrial) • Location: Canada
Source: Canada Buy and Sell
The Correctional Service Canada requires the services of a qualified contractor to complete HVAC Removal and Replacement of two Furnaces and 2 Air Conditioning units in building WA01.
Objectives: The qualified contract must: a.remove the existing two (2) gas fired furnaces; b.remove the existing two (2) air conditioning units; i.Dismantle, remove and dispose of the one (1) water
- Status
- Bidding
- Sector
- Manufacturing (Industrial), Natural Gas, Road, Water Supply and Storage, Commercial
- Location
- Canada
- Updated
- 3 Nov 2026
- Source
- Canada Buy and Sell
ConstructChat
Ask ConstructChat about HVAC Removal and Replacement – 2 x Furnaces and 2 x Air Conditioning Units
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | open |
Taiyo status | Bidding |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The Correctional Service Canada requires the services of a qualified contractor to complete HVAC Removal and Replacement of two Furnaces and 2 Air Conditioning units in building WA01. Objectives: The qualified contract must: a.remove the existing two (2) gas fired furnaces; b.remove the existing two (2) air conditioning units; i.Dismantle, remove and dispose of the one (1) water-cooled air conditioner in the mechanical room, c.supply and install two (2) two new gas fired furnaces, and d.supply and install two (2) new air conditioning units. Deliverables: 1.Decommission and remove existing two (2) furnaces, two (2) air conditioning units, the old flue and chimney. a.The Contractor must remove and dispose of existing fresh air intake and exhaust. b.The existing flue and chimney must be decommissioned and capped by the Contractor. i.The flue side outlet will need a reducer to complete decommissioning and capping. ii. The chimney must be dismantled to the roof level and capped with a doghouse or other suitable cover. 2.Supply, install, program, commission, and verify the two (2) new furnaces and two (2) new air conditioning units to ensure full functional operation: a.Existing furnaces are currently running at 80% efficiency: •One (1) Model- “Eng Air XE 225 HB MA E S/S C” natural gas furnace, has an hourly BTU O/P of 180,000 at an elevation up to 2000ft. or 162,000 at an elevation up to 4500ft. AND •One (1) Model - “X3 160 HBMAE natural gas furnace, has an hourly BTU O/P of 128,000 at an elevation up to 2000ft. or 115,200 at an elevation up to 4500ft. Existing air conditioners are: •One (1) unit Engineered Air Model– “XE-225/C the condensing unit is Engineered Air Model CUEA61 Tagged ( CU-1 )” AND •One (1) unit – “XE-160/C the condensing unit is Engineered Air Model CUA51 Tagged (CU-2)" Existing air conditioner(s) specifications: •Location: WA01 (Finance building) Manufacture: Engineered Air, Model: CUEA61-0, Serial#: M12612 CU-1, Type: R22, Halocarbon Capacity: 8.62 Kg, Cooling Capacity: 6.1 Tons AND •Location: WA01 (Finance building) Manufacture: Engineered Air, Model: CUA-51-0, Serial#: M12612-CU-2, Type: R22, Halocarbon Capacity: 7.25 Kg, Cooling Capacity: 5.0 Tons |
Location
Country | Canada |
Source
Source | Canada Buy and Sell |
URL |
More Details
Record type | Tender |
Sector | Manufacturing (Industrial), Natural Gas, Road, Water Supply and Storage, Commercial |
Article published date | 2026-08-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Manufacturing (Industrial) tenders in Canada
- Replacement of a bus paint booth and ventilation system (Industrial equipment)
- Pre-purchase of ventilation equipment for St-Fidèle school (Industrial equipment)
- Autonomous analysis equipment for the Legionella pneumophila pathogen in industrial waters (Scientific instruments)
- Robot welder (Industrial equipment)
- Renewal of laundry equipment for the Saint-Ferdinand Administrative Center. (Industrial equipment)
- 4103-23-AP06 - Automated saw for manufacturing asphalt test specimens in the laboratory for the Infrastructure Materials Department (Scientific Instruments)
- Acquisition of a wall valve and a flapper for the sewer - Water service (Industrial equipment)
- Replacement of washing equipment (Industrial equipment)
